Old 12-04-2008   #1
Tilers Forums Arms Member
Points: 2,358, Level: 29 Points: 2,358, Level: 29 Points: 2,358, Level: 29
Activity: 25% Activity: 25% Activity: 25%
 
graham31's Avatar
Default when to charge day rate or sqm2

Hi i'm going on a tilling course as soon as i get my finances in order(prob bout a month)but i'm reading and trying to gather as much info as i can.

So my question is when do you charge a day rate as a pos to sqm2 rate?

thanks Graham

graham31 is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote

This is an Adsense Revenue Sharing Forum.
Old 12-04-2008   #2
Tilers Forums Admin
 
Dave's Avatar
 
Acceleracers Track Mod Champion!
Join Date: May 2007
Location: co.durham
Posts: 12,230
Thanks: 1,029
Thanked 1,164 Times in 835 Posts
Dave is a splendid one to beholdDave is a splendid one to beholdDave is a splendid one to beholdDave is a splendid one to beholdDave is a splendid one to beholdDave is a splendid one to behold
View Dave's Photo Album
Default Re: when to charge day rate or sqm2

Well graham..i dont normally get involved in the pricing side of things.....but what you do is....work out what your day rate is going to be...then what your mtrge prices are......then when it comes to pricing a job work it on mtrge and if this does not reach your day rate then switch to day rate...taking into fact how long it should take.........

Dave is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 12-04-2008   #3
Tilers Forums Arms Member
Points: 1,282, Level: 19 Points: 1,282, Level: 19 Points: 1,282, Level: 19
Activity: 0% Activity: 0% Activity: 0%
 
Matthew77's Avatar
 

Join Date: Dec 2007
Location: Dorset
Posts: 94
Thanks: 2
Thanked 1 Time in 1 Post
Matthew77 is on a distinguished road
View Matthew77's Photo Album
Default Re: when to charge day rate or sqm2

I'd tend to charge day rate for anything like removing existing tiles as you have no idea how well they are stuck down therfore making it harder to price!
Matthew77 is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 12-04-2008   #4
JUST ENJOYING THE RIDE!
Points: 4,082, Level: 40 Points: 4,082, Level: 40 Points: 4,082, Level: 40
Activity: 0% Activity: 0% Activity: 0%
 
robbo's Avatar
 

Join Date: Nov 2007
Posts: 1,146
Thanks: 16
Thanked 74 Times in 68 Posts
robbo is on a distinguished road
View robbo's Photo Album
Default Re: when to charge day rate or sqm2

Don't forget its about cuts etc as well as mtrge, so you could have only a few metres to do but with loads of fiddly cuts that could bump up the time the job will take....

SPEED MEANS NOTHING WITHOUT QUALITY....
robbo is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 12-04-2008   #5
TF Mod & Head Grinch


 
Sir Ramic's Avatar
 

Join Date: Jan 2008
Location: Stourbridge, West Midlands
Posts: 2,250
Thanks: 97
Thanked 291 Times in 195 Posts
Sir Ramic is a jewel in the roughSir Ramic is a jewel in the roughSir Ramic is a jewel in the rough
View Sir Ramic's Photo Album Send a message via MSN to Sir Ramic
Default Re: when to charge day rate or sqm2

Spot on Dave.
Sir Ramic is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 12-04-2008   #6
sWe
TilersForums Trusted Member

Points: 6,463, Level: 52 Points: 6,463, Level: 52 Points: 6,463, Level: 52
Activity: 57% Activity: 57% Activity: 57%
 
sWe's Avatar
 

Join Date: Feb 2008
Location: Sweden
Posts: 1,548
Thanks: 64
Thanked 173 Times in 118 Posts
sWe has a spectacular aura aboutsWe has a spectacular aura about
View sWe's Photo Album Send a message via MSN to sWe
Default Re: when to charge day rate or sqm2

You might find this useful.

sWe is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 12-04-2008   #8
sWe
TilersForums Trusted Member

Points: 6,463, Level: 52 Points: 6,463, Level: 52 Points: 6,463, Level: 52
Activity: 57% Activity: 57% Activity: 57%
 
sWe's Avatar
 

Join Date: Feb 2008
Location: Sweden
Posts: 1,548
Thanks: 64
Thanked 173 Times in 118 Posts
sWe has a spectacular aura aboutsWe has a spectacular aura about
View sWe's Photo Album Send a message via MSN to sWe
Default Re: when to charge day rate or sqm2

I think Dave put it as simple as it gets then.

sWe is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 12-04-2008   #9
Tilersforums Black Prince


 
Fekin's Avatar
Default Re: when to charge day rate or sqm2

There really isn't a defined answer, but Dave's answer comes closest.

Basically time is money, simple as.

Main thing you need to decide on first is the minimum you need to earn for a days work, and this differs up and down the country.
Some need £200 plus, down to basically anything they can get.
So say the average is £130 a day minimum needed, and your pricing up a full bathroom that's 20 sqm wall tiling, then you'd possibly price up on sqm rate, say £20, so for the whole room you'd be quoting £400 labour for the tiling, and it took 3 days to tile, you're looking at a day rate of £133 which is just over what you really need.
But if you then looked at tiling an complicated 10sqm kitchen with loads of wet cutting round 12 sockets, 2 windows and a extractor hood in tiny 10cm x 10cm tiles and whatever else and it was going to still take 3 days to complete, you wouldn't charge sqm rate because you would only end up earning £66 a day over 10 sqm.

Basically smaller tiles equals fitting many more tiles than fitting larger tiles, equals taking longer to fit the same amount od sqm than iot would with larger tiles.
Different tiles can mean the difference between dry cutting and wet cutting, and wet cutting takes a lot longer than dry cutting.

So in essence, the longer you think it will take to do the same amount of sqm area, the more you need to charge, but theres a trade off too this, being new to the game isn't an option to charge more for the sqm area because your slow and can't tile as much as someone else in the same amount of time because you'll never get a job in the first place thinking like this.
Earlier on when your starting out, you will need to earn less to start with because your not as fast as other established tilers, and your going to need more time to complete a job because your a new guy, but speed comes with experiance, so the first few jobs will take longer than you expect it to, but you'll get quicker through experiance and finish jobs in half the time, doubling your day rate.

I hope this all makes sense, Im quite........ over the limit at the moment
Fekin is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 12-04-2008   #10
sWe
TilersForums Trusted Member

Points: 6,463, Level: 52 Points: 6,463, Level: 52 Points: 6,463, Level: 52
Activity: 57% Activity: 57% Activity: 57%
 
sWe's Avatar
 

Join Date: Feb 2008
Location: Sweden
Posts: 1,548
Thanks: 64
Thanked 173 Times in 118 Posts
sWe has a spectacular aura aboutsWe has a spectacular aura about
View sWe's Photo Album Send a message via MSN to sWe
Default Re: when to charge day rate or sqm2

Quote:
Originally Posted by Fekin View Post
I hope this all makes sense, Im quite........ over the limit at the moment
You've written more long posts than usual lately, Fekin mate Are you not feeling well?

sWe is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 12-04-2008   #12
Tilers Forums Arms Member
Points: 2,358, Level: 29 Points: 2,358, Level: 29 Points: 2,358, Level: 29
Activity: 25% Activity: 25% Activity: 25%
 
graham31's Avatar
Default Re: when to charge day rate or sqm2

Quote:
Originally Posted by Fekin View Post
There really isn't a defined answer, but Dave's answer comes closest.

Basically time is money, simple as.

Main thing you need to decide on first is the minimum you need to earn for a days work, and this differs up and down the country.
Some need £200 plus, down to basically anything they can get.
So say the average is £130 a day minimum needed, and your pricing up a full bathroom that's 20 sqm wall tiling, then you'd possibly price up on sqm rate, say £20, so for the whole room you'd be quoting £400 labour for the tiling, and it took 3 days to tile, you're looking at a day rate of £133 which is just over what you really need.
But if you then looked at tiling an complicated 10sqm kitchen with loads of wet cutting round 12 sockets, 2 windows and a extractor hood in tiny 10cm x 10cm tiles and whatever else and it was going to still take 3 days to complete, you wouldn't charge sqm rate because you would only end up earning £66 a day over 10 sqm.

Basically smaller tiles equals fitting many more tiles than fitting larger tiles, equals taking longer to fit the same amount od sqm than iot would with larger tiles.
Different tiles can mean the difference between dry cutting and wet cutting, and wet cutting takes a lot longer than dry cutting.

So in essence, the longer you think it will take to do the same amount of sqm area, the more you need to charge, but theres a trade off too this, being new to the game isn't an option to charge more for the sqm area because your slow and can't tile as much as someone else in the same amount of time because you'll never get a job in the first place thinking like this.
Earlier on when your starting out, you will need to earn less to start with because your not as fast as other established tilers, and your going to need more time to complete a job because your a new guy, but speed comes with experiance, so the first few jobs will take longer than you expect it to, but you'll get quicker through experiance and finish jobs in half the time, doubling your day rate.

I hope this all makes sense, Im quite........ over the limit at the moment
Small tiles big tiles wet cut dry cut things i haven't considered this was the sort of answer i was looking for Thanks Fekin