Tilers Forums - Tile Forums - Tile Forum - Tiling Courses - Tiling Forum Tile UK - The Industry Tile Magazine
Go Back   TilersForums.co.uk | Tile Forums | Tiling Forum > Tile Forums | Tiling Forums | Tilers Forum > Tiling Forum
Forgot Password? Join Us!

Notices

Tiling Forum Tiling ForumDiscussions on all aspects of tiling & installing tiles in the tiling forum.

Reply
 
LinkBack Thread Tools Display Modes
Old 19-03-2008   #1
Tilers Forums Arms Member
Points: 6,444, Level: 52 Points: 6,444, Level: 52 Points: 6,444, Level: 52
Activity: 45% Activity: 45% Activity: 45%
 
monty's Avatar
 

Join Date: Sep 2007
Posts: 1,499
Thanks: 266
Thanked 154 Times in 115 Posts
monty will become famous soon enough
View monty's Photo Album
Default Start my first paid job tomorrow!!

Hi peeps

Start my first paid job tomorrow (Sh***ing myself) 21 sqm floor to ceiling and 2 sqm floor.

Where do i start??? 1 wall to the left as a window which recess needs doing, shower wall facing as you walk in as nothing, wall to right as sink which as been boxed in needs tiling on top aswell (around sink) ..and last wall is the door wall..

Am i right in starting on the window wall, centering it and checking my cuts all around the room from there and finishing above the door? And do i leave the last tile nearest to the floor out until i have put the floor down??

Any advice appreciated..

Thanks

monty is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote

This is an Adsense Revenue Sharing Forum.
Old 19-03-2008   #2
* TF Super Moderator *


 
grumpygrouter's Avatar
 

Join Date: Apr 2007
Location: Nairn
Posts: 5,268
Thanks: 370
Thanked 453 Times in 356 Posts
grumpygrouter is a jewel in the roughgrumpygrouter is a jewel in the roughgrumpygrouter is a jewel in the rough
View grumpygrouter's Photo Album
Default Re: Start my first paid job tomorrow!!

Monty, you need really to start from the main focal point, usually the window but not always, and work out from there. You may want to chack out the levels around the window as well, in my experience there is quite often a difference in the levels of the wall and the window area and this can kick out your "L" shape cuts around the window. it is usually a good idea to finish around the door area as it is easier to "hide" any problems that may arise viz grout lines!

As for leaving the last line of tiles above the floor until the floor is done, that is a matter of personal choice. I don't do this myself as I prefer to have the walls all finished before I do the floors. Why wait to grout the wall until the floor is finished? you only end up getting wall grout all over the floor!

Good luck, take some pics.

Grumpy

Grumpy


Balancing Act Accounting
Turnover is Vanity, Profit is Sanity, Cash is reality!
grumpygrouter is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 19-03-2008   #3
TF Moderator & Pro Tiler


 
MICK the Tiler's Avatar
 
Belter Champion! Blitz World War Champion! Yeti Sports 1- Bloody Pingu Champion!
Join Date: Mar 2008
Location: Brisbane, Australia
Posts: 1,092
Thanks: 85
Thanked 261 Times in 169 Posts
MICK the Tiler has a spectacular aura aboutMICK the Tiler has a spectacular aura about
View MICK the Tiler's Photo Album
Default Re: Start my first paid job tomorrow!!

If the wall tiles need to line up with the floor start with the floor by setting out the floor you'll have to just line the walls up from there.

If floor tiles are different size to walls then start with walls check your heights of fixtures (Taps sills Bath etc) first and work out what cut you'll have at cornice and floor leave bottom tile off to cut in after floor is laid. Always try and centre the window (Not always possible) next work out widths aross the room so you have good size cuts.

So what you are really trying to do when you first get there is.

1 check tiles quanity and size
2 check and double check lay-out (Freize tiles feature walls ec) with client and make sure you and the client fully understand each other and agree on what needs to be done
3 set-out tiles horozontally then vertically for best cuts and looks
4 decide on whether the floor is tiled first or the walls depending on tiles sizes and layout.
5 take your time get it right before you start fixing anything
6 don't be nervous sell yourself.
7 take the camera and if you have a problem stop take some pics and post them and we can give advice.
MICK the Tiler is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 19-03-2008   #4
Tilers Forums Arms Member
Points: 6,444, Level: 52 Points: 6,444, Level: 52 Points: 6,444, Level: 52
Activity: 45% Activity: 45% Activity: 45%
 
monty's Avatar
 

Join Date: Sep 2007
Posts: 1,499
Thanks: 266
Thanked 154 Times in 115 Posts
monty will become famous soon enough
View monty's Photo Album
Default Re: Start my first paid job tomorrow!!

Cheers grumpy....i was thinking of centering the window checking my cuts around the room and if ok then start from there, tiling the full wall leaving 1 tile out all around the window putting another batton above window to continue to ceiling, square the area of near the window...remove batton then maskin tape top recess tile until set..does this make sense?? and is this right??

Monty
----
Quote:
Originally Posted by MICK the Tiler View Post
If the wall tiles need to line up with the floor start with the floor by setting out the floor you'll have to just line the walls up from there.

If floor tiles are different size to walls then start with walls check your heights of fixtures (Taps sills Bath etc) first and work out what cut you'll have at cornice and floor leave bottom tile off to cut in after floor is laid. Always try and centre the window (Not always possible) next work out widths aross the room so you have good size cuts.

So what you are really trying to do when you first get there is.

1 check tiles quanity and size
2 check and double check lay-out (Freize tiles feature walls ec) with client and make sure you and the client fully understand each other and agree on what needs to be done
3 set-out tiles horozontally then vertically for best cuts and looks
4 decide on whether the floor is tiled first or the walls depending on tiles sizes and layout.
5 take your time get it right before you start fixing anything
6 don't be nervous sell yourself.
7 take the camera and if you have a problem stop take some pics and post them and we can give advice.
thanks mick...not sure if the floor tiles are the same yet..do i treat each wall individually? or try and get same cuts on opposite walls?

Monty

Last edited by monty; 19-03-2008 at 11:32 AM. Reason: Automerged last two posts from the same member. Happy tiling. :-)
monty is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 19-03-2008   #5
TF Moderator & Pro Tiler


 
MICK the Tiler's Avatar
 
Belter Champion! Blitz World War Champion! Yeti Sports 1- Bloody Pingu Champion!
Join Date: Mar 2008
Location: Brisbane, Australia
Posts: 1,092
Thanks: 85
Thanked 261 Times in 169 Posts
MICK the Tiler has a spectacular aura aboutMICK the Tiler has a spectacular aura about
View MICK the Tiler's Photo Album
Default Re: Start my first paid job tomorrow!!

do you use non-slump adhesive over there why the batton?
MICK the Tiler is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 19-03-2008   #6
TF Moderator & Pro Tiler


 
MICK the Tiler's Avatar
 
Belter Champion! Blitz World War Champion! Yeti Sports 1- Bloody Pingu Champion!
Join Date: Mar 2008
Location: Brisbane, Australia
Posts: 1,092
Thanks: 85
Thanked 261 Times in 169 Posts
MICK the Tiler has a spectacular aura aboutMICK the Tiler has a spectacular aura about
View MICK the Tiler's Photo Album
Default Re: Start my first paid job tomorrow!!

Always match cuts on oposite walls more pro tiler finish.
MICK the Tiler is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 19-03-2008   #7
Tilers Forums Arms Member
Points: 6,444, Level: 52 Points: 6,444, Level: 52 Points: 6,444, Level: 52
Activity: 45% Activity: 45% Activity: 45%
 
monty's Avatar
 

Join Date: Sep 2007
Posts: 1,499
Thanks: 266
Thanked 154 Times in 115 Posts
monty will become famous soon enough
View monty's Photo Album
Default Re: Start my first paid job tomorrow!!

I'm a total beginner...and going of the past threads and my tiling course its best to start with a batton until i become confident to start without it.

monty
monty is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 19-03-2008   #8
TF Moderator & Pro Tiler


 
MICK the Tiler's Avatar
 
Belter Champion! Blitz World War Champion! Yeti Sports 1- Bloody Pingu Champion!
Join Date: Mar 2008
Location: Brisbane, Australia
Posts: 1,092
Thanks: 85
Thanked 261 Times in 169 Posts
MICK the Tiler has a spectacular aura aboutMICK the Tiler has a spectacular aura about
View MICK the Tiler's Photo Album
Default Re: Start my first paid job tomorrow!!

Fair enough always do what your comfortable with.
MICK the Tiler is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 19-03-2008   #9
Tilers Forums Arms Member
Points: 6,444, Level: 52 Points: 6,444, Level: 52 Points: 6,444, Level: 52
Activity: 45% Activity: 45% Activity: 45%
 
monty's Avatar
 

Join Date: Sep 2007
Posts: 1,499
Thanks: 266
Thanked 154 Times in 115 Posts
monty will become famous soon enough
View monty's Photo Album
Default Re: Start my first paid job tomorrow!!

Anymore advice lads??

Monty
monty is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 19-03-2008   #10
TilersForums Contributor
Points: 695, Level: 13 Points: 695, Level: 13 Points: 695, Level: 13
Activity: 0% Activity: 0% Activity: 0%
 

Join Date: Jan 2008
Posts: 46
Thanks: 0
Thanked 0 Times in 0 Posts
andyb_987 is on a distinguished road
View andyb_987's Photo Album
Default Re: Start my first paid job tomorrow!!

what course did u go on monty?
i was at the NETT in JAn starting to forget some stuff as i work for the fire service and have not really done a great deal of jobs yet-part time off course

Any advice on tiling round the window how to square it of?

cheers
andyb_987 is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 20-03-2008   #11
Tilers Forums Arms Member
Points: 6,444, Level: 52 Points: 6,444, Level: 52 Points: 6,444, Level: 52
Activity: 45% Activity: 45% Activity: 45%
 
monty's Avatar
 

Join Date: Sep 2007
Posts: 1,499
Thanks: 266
Thanked 154 Times in 115 Posts
monty will become famous soon enough
View monty's Photo Album
Default Re: Start my first paid job tomorrow!!

Hi

I did my course at NETT too back in november..

The method i was shown at Nett.

Build two colums around the window then bridge the gap at the top. Then with level make sure its all square. Then measure the distances to the highest points on the two sides top and botttom and cut all tiles to the same size, ensuring this will square off the window. Then do all the straight cuts first then do all the corners and then insert the trim. Then do the recess.


Monty
----
Just completed my first day and hardley got F**k all done. By the time i put all the dust sheets down, got all the tools out, worked out all cuts with gauge rod...and then had to drive 10 miles to TOPPS to get primer and trim that customer forgot to get..( 2 hours there and back stuck in traffic) ..Got half a wall done upto the window so going to go in tomorrow and play catch up...

Last edited by monty; 20-03-2008 at 11:03 PM. Reason: Automerged last two posts from the same member. Happy tiling. :-)
monty is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 20-03-2008   #12
Tilersforums Black Prince


 
Fekin's Avatar
Default Re: Start my first paid job tomorrow!!

Good luck on the job

Fekin is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Reply

Bookmarks

Tags
job, paid, start, tomorrow
Discuss Start my first paid job tomorrow!! at the Tiling Forum within the TilersForums.co.uk | Tile Forums | Tiling Forum; Hi peeps Start my first paid job tomorrow (Sh***ing myself) 21 sqm floor to ceiling ...
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On
Trackbacks are On
Pingbacks are On
Refbacks are On
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Job Available for a Tiler looking for work Raja Tiling Forum 18 26-03-2008 10:13 AM
help with a job LM Ceramics Tiling Forum 18 26-02-2008 08:05 AM
quoting for first job LM Ceramics Tiling Forum 13 05-02-2008 08:53 PM

Google Search

All times are GMT. The time now is 01:32 AM.


Powered by vBulletin® Version 3.7.2
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.2.0 RC8



Looking for a tiler?
Post Your Tiling Job HERE for FREE!
----------

COMMUNITY SPONSORS

Manufacturers
Drill Porcelain Tile - 365Drills

Mapei Tile Adhesive

Perfect Silicone Joints - Supporting the Tile Forum

Rubi Tiling Tools : Sponsors of the Tiling Forum

Schluter Systems

Suppliers
Tiling Tools by Trade Tiler  Forum Sponsors of Tiling Tools

CTD Tiles & TILE Base; Tilers Forum Sponsors

Quality Wetroom Solutions

Electric Underfloor Heating by UHeat

General Sponsors

TSJ - Tile and Stone Journal - THE Tile & Stone Journal

Tile UK Magazine

Traders Liability Insurance - Liability Insurance for Tilers

Find Trusted Tradesmen

Sponsor Tilers Forums - The UK's Biggest Tile Forum / Tile Forums