Thanks Grumpy,I allways try and tie up with the
tiler before doing any prepping cos have found each to have their own preferences ,for instance 2 weeks ago I reskimmed a few rooms and the owner arranged for a
tiler to call while I was on site the owner had all ready slabbed out a bathroom but the window reveals were showing 7" on the head .5" on the sill .I rarely make any suggestions (would have been easy enough to remove plasterboard from external wall and cling it ).the
tiler wanted the wall bonded out .
A few days later another renovation walls out 6-10 mill in places ,the developer (same ) suggested bonding plaster as the tiling was starting in 3 days .This
tiler wouldnt hear of tiling over bonding.
This is all ok by me when the
tiler gets his preferred bed and I do as asked ,but eventually it will come down to my own job and my call so knowing the proper materials when I have to stand over the job is vital.
Cheers all ....Corky