I'm just finishing the 4th stone bathroom on the Bowes job and then start the full ground floor in 60x60 limestone..
what about you..?
Welcome to Tilers Forums Tiling Forum
The UK's Biggest Tiling Forum for DIY and Professional Tilers; find
DIY and Professional Wall and Floor Tilers are Welcome
Advice from by Tilers, Manufacturers, Distributors and Tile Suppliers
p.s.: Registered members will not see this ad
11Likes 


I'm just finishing the 4th stone bathroom on the Bowes job and then start the full ground floor in 60x60 limestone..
what about you..?
Nothing, I'm on holiday!
I'm going to be slobbing about in my pants watching prison break.
Happy days.....



Im going to be tiling...
75m random pattern floor. Going to give the monti a work out.
AMEY TILING - Ceramic, porcelain, mosaic and natural stone tiling
Richard Amey - 07817 904 897 Email - Ameytiling@Hotmail.co.uk
Continuing another birdbath, a simpler one, and the charity piece and a new piece for my California customer![]()


I got a kitchen to finish off then a holiday let to fit a kitchen and tile the bathroom. All bottom end stuff at the moment.
tapatalk on my HTC



UFH fit Mon/Tues, this is the first one I'll have done using the U-Heat team, so a service and product review to follow. Bathroom to finish end of the week.
Last edited by Bri; 29-01-2012 at 05:03 PM.


bathroom floor to rip out and re fit,then a stone showeroom floor to do and some plastering at end of the week this week

Silicon bathroom I finished in Friday, 15m Outhouse floor to tile in readiness for hot tub, and then 20m kitchen floor all at same customer, cottage renovation.
The results of quality work last longer than the shock of the price




Tomoz I'll finish a cottage( front porch, big stone fireplace, kitchen floor,bathroom floor and shower plus narrow hallway to bathroom etc and inside steps on that floor), 5 days total.
Tuesday I start a kitchen floor and splashback, Thursday/fri we have two showers to rip out, tank and retile after some clown made a complete mess of them with leaks galore.
Hillhead Tiling Services 2012
Contact Joe @ http://www.hillheadtilingservices.co.uk/


small bathroom for next door neighbour , walk to work thats the life



Back down to Nottingham with Nick (Macten) tomorrow, hope the journey is better than last Friday.![]()
philhobsontiler@live.co.uk
07711 310 960
Measure twice cut once
www.philhobsontiler.co.uk
http://www.youtube.com/watch?v=y0i8NYD-QgE
http://www.youtube.com/watch?v=sg7qjC_C8AM

plastering mon/tues and then tiling a bathroom on Wednesday I've not even seen yet so no doubt its gonna be a right mess and refinishing a travertine floor at end of week.

Busy week.
3 townhouses in Edinburgh, 2 houses in a wee place down the coast (Maidens) & a house in Ochiltree. all meant to be finished for friday.
Oh & another barn conversion outside Ayr.
Trying to give 2 of the Edinburgh houses away!!



Do you really want to know - Really!!!!!!!!
20sq mts of BQ 250x200 bumpy white above and below kitchen units with 3 vertical rows of single strip 50mm stone mosaic from ceiling to floor.
5sq mts of the cheapest 400x300 travertine to could look at for the floor.
And do you really want to know the best bit - it's on the 4th floor of a block of flats which only has 4 floors and........ No lifts!
You have to walk through the flat to get to the kitchen and I shall have to do all the cutting in the room.
We took this job on a while ago and my son was booked in for itbut he's still finishing off another project
, so instead of going for my pension on Monday he said I would do it
.
I'll be off to bed soon to recover before I start.
find us : www.tilernewcastle.co.uk visit us : www.timelesstilingsolutions.com
' CREATING TIMELESS WALLS & FLOORS - CREATING TIMELESS WALLS & FLOORS '



The phrase, " He had the block of flats " will apply once you finish John..![]()

been on a unexpected full gut and refurb in windsor for the last 3 weeks and haven't been home since last monday and won't get back until at least friday, not suppose to be doing weekends but i've got the spreads turning up tomorrow and i didn't have enough areas clear for them to hit. Gonna be like this for the next couple of months but surprising how hard it is to let the client down when it's your old dear!
bathroom and a small wetroom in this one so will post pics as it goes![]()

ohhh bumpy whites![]()
Bathroom to do mon/tues. then up to Falkirk to do a William hills. Should be back home Sunday.




still on the job in sutton start the marble ensuite tomoz
Tiling is in our blood
http://www.dnatiling.com/DNA_Tiling/Home.html
Middle of Wetroom re-fits in an old folks home in Glasgow, jobs been held up due to plumber being caught drunk on the job! thought them days had long gone.
2 higher end wetrooms and kitchen floor to do in a listed House in Uddingston, pleasure to work on House has loadsa history and charcter, makes things a wee bit more intresting.
45 m2 of UFH and 600x600 slate on top. should make the Dewalt earn its keep!!!


Im doing a victorian tiling course this week, and was doing some tiling on a narrowboat yesturday!


Porc conservatory floor & bathroom. Nothing exciting![]()
Geoff - Plan Tec Tiling & Wet Room Solutions - Covering EAST DORSET
Tiler in Wimborne , Tiler in Ferndown , Tiler in Poole , Tiler in Bournemouth , Tiler in Christchurch , Tiler in Ringwood
www.plantectiling.co.uk
www.facebook.com/PlanTecTiling

Nothing exciting for me, 3 more nights left on this supermarket job (250m2 wall tiling) before moving on to the next one on Thursday
Back on the RAF bases as from tomorrow. should be on this one for around 6 weeks![]()

Well Ive had today off to do my tax return which I have just finished (done early this year lol) then a few easy simple jobs for the rest of the week....no stress at alst.

Working on an apartment block last week and this week. Finished 6 got another 6 to do. Also doing a private en suite a few nights this week then a kitchen floor on Saturday, so can't complain.
Bookmarks