Well in tomorrow to sand 150 mtrs of Anhydrite, then off till new year, had enough...
When you stopping/ceasing work for xmas.?
Welcome to Tilers Forums Tiling Forum
The UK's Biggest Tiling Forum for DIY and Professional Tilers; find
DIY and Professional Wall and Floor Tilers are Welcome
Advice from by Tilers, Manufacturers, Distributors and Tile Suppliers
p.s.: Registered members will not see this ad



Well in tomorrow to sand 150 mtrs of Anhydrite, then off till new year, had enough...
When you stopping/ceasing work for xmas.?



Friday afternoon! Gonna do Weds, Thur and Fri next week as well!!! Getting loads coming in now so using the time to get ahead.



Looks like it has stopped now. Client wanted a bathroom tiled in Somerset but other trades havent got it ready for us.
I was hoping to get another days work in but seems they havent accepted the price quoted.
Wall and floor tiler in the West Midlands, Dudley, Stourbridge. www.nptiling.co.uk


xmas eve for me probably. i got worktops to do tomorrow then a bathroom to finish before xmas. i'd sooner be in work atm than running errands for the wife![]()



Got to take littlen and me xmas prezzy shopping..( love last minute rush NOT!!) thurs morning... then thurs afternoon till when we drop.. out for slurps with Dave @ PHG...![]()


fri night finish for me,3 days left on a 70 metre polish porc job for an italian family then a small fugo fresca re colour job for another italian family.....i hope they pass me around
taking 2 weeks off to spend with the family,nothing much else coming in now anyway
xmas here we come!

tomorrow,bathroom to grout,lads finishing plastering a cottage.then 2 weeks in the sun,ok ok,im kidding,2 weeks in the rain/snow/sleet wind,but still 2 weeks
Having works do on thursday,about 30 of us selfemployed building trade boys hitting burnley at dinnertime,should be fun![]()
beer,its great
www.cwithnellplasteringtiling.co.uk


was supposed to be finished tomorrow, but couldn't finish the bathroom im doing, due to the wrong units being sent, so i got a small kitchen floor tomorrow then back to finish the bathroom thursday.
and i must admit ive had enough now, looking forward to a brake....
need to get some work for the new year, my phone hasn't rang for 2 weeks..
andy-allen-tiling
Wall and Floor Tiler based in Gloucester and covering Cheltenham-Forest of Dean-Stroud-Tewksbury-The Cotswolds.
Full bathroom fitting service, including all plumbing, plastering, and electrical installations, Free advice and design.
tel.........01452 721112
mobile...07976883412
web site..... www.andy-allen-tiling.co.uk
ANY TILE-ANY SURFACE-ANYWHERE

Small slate porch to seal in the morning then that's me done til Jan 3rd. Was asked to do a 21m2 bathroom this week "It'll only take you a day or so"!! turned that down, was then asked to do a day in Harrogate (250 mile round trip) on Friday... turned that down too. Not got to be there too early tmrw so it's beer time now![]()

Polished Porc floor de-waxed & sealed today. Dreaded BLACK grout tomorrow morning........then thats it. Till the 28th Dec, then its just a small porch that I got asked to slip in.




I'm working the full 5 days this week,
I was on tonight until 7 and hard push on in a full house.
If I don't finish by Friday then I'll go back in the new year.
I'm off until the 2nd January then flat out for the next few months luckily.
Roll on Saturday.
Hillhead Tiling Services 2012
Contact Joe @ http://www.hillheadtilingservices.co.uk/
got finished at lunchtime today, had a delay with customers changing their mind about kitchen floor tiles so knocked it on head till New Year![]()
Finished at 9.00 tonight, sealing travertine ready for tomorrow morning. A couple of square metres of slate to grout, two custom made vanity units with elm worktops, two sinks, a wall hung W/C, two showers, two mirrors, one wall light ( I think that's all) for Thursday. At least all the prep is done.
Christmas shopping for the wife on Friday. Probably working in Edinburgh next week, at least I'll get home at night!

Got asked today if we would work through the hols,
Finish friday for a long weekend then back on tuesday.
No rest for the wicked.![]()

finished last friday not back till 3rd Jan....... oh yeeeeeeS!
you must all buy this song from any good download site for just 79p. Proceeds to Blesma, RAFA and RAFBF charities
Teresa Hind - The Fight Goes On




im of tomoz till 4th 0f jan
Tiling is in our blood
http://www.dnatiling.com/DNA_Tiling/Home.html




IMG_0132.jpgNo more canteen food![]()
Tiling is in our blood
http://www.dnatiling.com/DNA_Tiling/Home.html

Was supposed to be finishing tomorrow but due to the job from hell (everything has gone wrong) from dewalt sds drill packing up at start to a wall collapsing today due to a water pipe bursting when a joiner drilled thru it last night probably be finishing xmas eve. not happy!!
BY THE TIME YOU ARE OLD ENOUGH TO REALISE YOUR PARENTS WERE RIGHT...........
YOU HAVE YOUR OWN CHILDREN TELLING YOU THAT YOU ARE WRONG......................
I'm gonna take at least two weeks off and if I can swing it, a third week after kids have gone back to school, to recharge my batteries and see if I can take the pup on some shooting beats to give her some training![]()



Finished last friday and thought I was putting my feet up!
Started on the kitchen worktops Sunday and finished today.
Just got the tiling to do - going to put an advert on the Forum as my tools are away till 10th January 2012.
find us : www.tilernewcastle.co.uk visit us : www.timelesstilingsolutions.com
' CREATING TIMELESS WALLS & FLOORS - CREATING TIMELESS WALLS & FLOORS '
I've got 5 doors to cut & hang, some facing & skirting, a little boxing in some light fittings to change over, seal a bathroom & that should be me. Should blast it today then that's me till the 2nd of Jan



3rd I go back.
Kettles on , toast is in. Nearly time to go to the dales again.
Gunna be a dusty day sanding.
Anhydrite is a pain. You'll sleep well tonight!



Yep. 4 bathroom floors and whole ground floor of the house. Gunna be mad. Lol.



Then heating goes upto 45dgs over the Xmas break to force dry. Glad I ain't working in that.
How'd you get on Dave? You manage to get it all done? That's me finished up now for the year. Was a long hard day but at least I don't have to go back tomorrow & was paid cash with a Xmas tip. Think I should start my crimbo shopping lol
Sent from my iPad using Tapatalk - Couple a' Tools
Finished yesterday, got a call from an interior fit out company I do work for, one of there gaffers has just got the keys to his new house could I squeeze in his bathroom and kitchen splashback before crimbo day?????????
Doing it in hols now & prep a couple of wetrooms but I am getting a couple of days away withe Mrs and the Wean from the 26th.





finished today................
![]()
andy-allen-tiling
Wall and Floor Tiler based in Gloucester and covering Cheltenham-Forest of Dean-Stroud-Tewksbury-The Cotswolds.
Full bathroom fitting service, including all plumbing, plastering, and electrical installations, Free advice and design.
tel.........01452 721112
mobile...07976883412
web site..... www.andy-allen-tiling.co.uk
ANY TILE-ANY SURFACE-ANYWHERE
Bookmarks