Welcome to Tilers Forums Tiling Forum
The UK's Biggest Tiling Forum for DIY and Professional Tilers; find
- » Tile Advice for Bathroom Tiles, Kitchen Tiles, Wall Tiles, Floor Tiles
- » Customers can Find a Tiler, or Wall and Floor Tilers can Find Customers
- » Tiling Tools, Tile Adhesive, Tile Grout and other Tile Products
- » Advice and Discussion related to Tiling Courses and Tiling NVQ's
- » Professional Tilers can find Business Advice, Discounts, Trade Accounts
DIY and Professional Wall and Floor Tilers are Welcome
Advice from by Tilers, Manufacturers, Distributors and Tile Suppliers
REGISTER HERE FOR FREE
p.s.: Registered members will not see this ad
Discuss
How long should patching plaster be left before it can be tiled over? in the
Tiling Forum at TilersForums;
I've used patching plaster to a depth of 2-3mm in order to make good some areas. How long should I give it to dry, before tiling? (I will seal it ... -
New TilersForums Contributor
How long should patching plaster be left before it can be tiled over?
I've used patching plaster to a depth of 2-3mm in order to make good some areas. How long should I give it to dry, before tiling? (I will seal it with BAL APD Primer, when it is dry.)
Thanks.
-
-
Re: How long should patching plaster be left before it can be tiled over?
I would normally use rapid set adhesive for making good. Gypsum can cause problems down the line foe you.
-
-
Re: How long should patching plaster be left before it can be tiled over?
If it was bonding coat or hardwall i'm not so sure you can use cement based rapid set on these, so skim is the option. how long it takes to dry will depend on which tiler you ask.
-
-
New TilersForums Contributor
Re: How long should patching plaster be left before it can be tiled over?
Thanks for your replies. I should have said that I applied the 2-3mm of patching plaster to plasterboard, having first brushed on some diluted PVA.
-
-
Re: How long should patching plaster be left before it can be tiled over?
depending on room temp etc i would hazard a guess at 3/4 days or so.
-
-
Re: How long should patching plaster be left before it can be tiled over?

Originally Posted by
Yaglaser
Thanks for your replies. I should have said that I applied the 2-3mm of patching plaster to plasterboard, having first brushed on some diluted PVA.
Try not to use PVA in the future.
Plus its a rude word on this site.
-
-
Re: How long should patching plaster be left before it can be tiled over?

Originally Posted by
Del W
Try not to use PVA in the future.
Plus its a rude word on this site.
Not for plastering though...
"Experience is simply the name we give our mistakes"
-
-
TilersForums Contributor
Re: How long should patching plaster be left before it can be tiled over?

Originally Posted by
whitebeam
Not for plastering though...

I plastered PVA all over my walls and my tiles fell off.
Not a true story
-
-
New TilersForums Contributor
Re: How long should patching plaster be left before it can be tiled over?
From what I understand, it is pretty much standard practice to brush diluted PVA on to a bare wall and/or backing coat plaster prior to applying the skim coat. Here's a quote:
"Plasterers dilute it [PVA] to the recommendation on the container and brush it onto the wall. This creates a barrier and helps the plaster stick to the wall. It also prevents the plaster from drying out too fast and so helps prevent it cracking. You cannot normally plaster over finishing plaster without it cracking. Using a coat of PVA means that you can plaster over finishing plaster without it cracking."
-
Similar Threads
-
By 3Daughters in forum New Members Say Hi Here
Replies: 9
Last Post: 24-01-2011, 08:21 PM
-
By marksim in forum Tiling Forum
Replies: 7
Last Post: 23-01-2011, 09:03 PM
-
By Y! Answers in forum RSS Feeds
Replies: 0
Last Post: 28-01-2009, 11:30 PM
-
By Y! Answers in forum RSS Feeds
Replies: 0
Last Post: 21-07-2008, 04:20 AM
-
By MissTiler in forum Tiling Forum
Replies: 10
Last Post: 30-09-2007, 08:00 PM
Visitors found this page by searching for:
how long before tiling plastering
,
how long plaster before tiling
,
how long to wait after plastering to tanking
,
how long can be tiled after plastering
,
how long does a patch of plaster take to dry
,
how long does plaster take to dry out before tiling
,
how long should plaster be left before tiling
,
how long does 3mm plaster take to dry
,
when can i tile after plastering a wall
,
how long does it take patching plaster to dry
,
how soon after plastering can you tile walls
,
how soon can you tile after plastering
,
tiles wall patch plaster
,
patch plaster before tiling
,
how soon can i tile over plaster
,
how long does patching plaster take to dry
,
how long after i plaster can i tile
,
how long does plaster need to dry before tiling
Tags for this Thread
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules
Tilers Forums is the UK's largest wall and floor
tiling forum. Advice is provided free of charge to all users. Tilers Forums does not take responsibility for any loss or damage caused due to following advice found on this forum. All wall and floor tiling should be carried out by a qualified wall and floor tiler. Views expressed on this forum are of the users and not
Tilers Forums. Views expressed on this tiling forum are of the contributor only and not the forum as a whole. Not all views should be taken as fact but simply the opinion of the person posting. Readers are reminded to seek professional advice before undertaking any wall and floor tiling project.
Tilers Forums is a Trading Style of Untold Developments Ltd.
Search Engine Optimisation, Web Development and Online Marketing for the UK.
Bookmarks