Welcome to Tilers Forums Tiling Forum


The UK's Biggest Tiling Forum for DIY and Professional Tilers; find


  •  » Tile Advice for Bathroom Tiles, Kitchen Tiles, Wall Tiles, Floor Tiles
  •  » Customers can Find a Tiler, or Wall and Floor Tilers can Find Customers
  •  » Tiling Tools, Tile Adhesive, Tile Grout and other Tile Products
  •  » Advice and Discussion related to Tiling Courses and Tiling NVQ's
  •  » Professional Tilers can find Business Advice, Discounts, Trade Accounts

DIY and Professional Wall and Floor Tilers are Welcome


Advice from by Tilers, Manufacturers, Distributors and Tile Suppliers


REGISTER HERE FOR FREE


p.s.: Registered members will not see this ad

Page 1 of 11 12345 ... LastLast
Results 1 to 30 of 318
Like Tree52Likes
Discuss Bathroom project - Work in progress in the Tiling Forum at TilersForums; Apologies mods of this needs to go elsewhere.. please feel free to move it or bin it! Riiiight.. here goes.... We've been in our first house nearly 2 years now. ...
          
  1. #1
    Regular TilersForums Contributor davemul's Avatar
    Join Date
    May 2011
    Location
    Kent
    Posts
    442
    Thanks
    63
    Thanked 64 Times in 57
    Posts

    Default Bathroom project - Work in progress

    Apologies mods of this needs to go elsewhere.. please feel free to move it or bin it!

    Riiiight.. here goes....

    We've been in our first house nearly 2 years now. We've (well ... more like I'VE!) done everything else bar the bathroom. It's an old 1800's cottage so the bathroom was in a pretty bad way. Solidly built but nasty and OLD!

    I decided a few weeks ago to RIP it out and start from the beginning.

    First task was to move the hot water cylinder from in the bathroom to a new cupboard outside the room (thanks to Scruff from ultimatehandyman.co.uk for the advice!)

    Now you see it...



    Now you dont!



    Ive taken quite a lot out..

    CARNAGE





    Well, I picked up a load of bits today..

    Marmox goods and tiles!







    New shower pump for the house too



    Also have taken delivery of a taptile wireless light switch system Taptile - Ditch the switch one-touch mood lighting and dimming solutions for the bathroom and kitchen

    6 astro glass downlights

    an airflow icon15 extractor fan

    and some Polk RC60i ceiling speakers

    and a couple of remote water isolation switches about surestop

    More bits arrive tomorrow.. i'll update this thread as I go along... im taking next week off to start the plumbing and install!
    Rich likes this.

  2. The Following 4 Users Say Thank You to davemul For This Useful Post:

    GirlRacerRed (14-07-2011), macten (14-07-2011), Rich (15-07-2011)

  3. #2
    Tilers Forums Arms Member
    macten's Avatar
    Join Date
    Sep 2007
    Location
    Nottingham/Derby
    Posts
    1,417
    Thanks
    569
    Thanked 701 Times in 409
    Posts

    Default Re: Bathroom project - Work in progress

    Looking forward to seeing the progress Dave. Nothing like doing it all yourself.
    Especially good when it's your own home as all those little problems you come across are treated as a
    challenge and satisfying when overcome whereas on a paid job they are just a PITA
    TradePerfect
    Plumbing and Tiling solutions for Derby and Nottingham
    tradeperfect@sky.com
    Tel: 0790 2036456

  4. #3
    Healthy TilersForums Contributor Brian the Tile's Avatar
    Join Date
    Sep 2010
    Location
    north wales
    Posts
    194
    Thanks
    0
    Thanked 41 Times in 26
    Posts

    Default Re: Bathroom project - Work in progress

    looking good

  5. #4
    Regular TilersForums Contributor davemul's Avatar
    Join Date
    May 2011
    Location
    Kent
    Posts
    442
    Thanks
    63
    Thanked 64 Times in 57
    Posts

    Default Re: Bathroom project - Work in progress

    Few more bits arrived today, a few boxes from Grohe



    concealed cistern



    concealed fixed shower head



    some taps for the basin

    and the most expensive toilet flush ever.. dont ask me WHY! I just thought a flush button with a light ring would be cool!



    Oh and the dry deck 20 pump system turned up. Gravity drainage would be a bit of a prob so I thought id get it all pumped away. Kit looks pretty good. Very smart stuff check out the website The New Dry-Deck 20 from Pump Technology







    Rich likes this.

  6. The Following 2 Users Say Thank You to davemul For This Useful Post:

    macten (15-07-2011)

  7. #5
    TilersForums Trusted Member


    Rich's Avatar
    Join Date
    Sep 2009
    Location
    Lymington Hants
    Posts
    3,230
    Thanks
    744
    Thanked 939 Times in 606
    Posts

    Default Re: Bathroom project - Work in progress

    Brilliant! Keep us posted, we love threads like these


    And of course and questions, just ask
    AMEY TILING - Ceramic, porcelain, mosaic and natural stone tiling

    Richard Amey - 07817 904 897 Email - Ameytiling@Hotmail.co.uk

  8. #6
    Regular TilersForums Contributor davemul's Avatar
    Join Date
    May 2011
    Location
    Kent
    Posts
    442
    Thanks
    63
    Thanked 64 Times in 57
    Posts

    Default Re: Bathroom project - Work in progress

    Thanks rich! Got a few q's going in the wet room

  9. #7
    Regular TilersForums Contributor davemul's Avatar
    Join Date
    May 2011
    Location
    Kent
    Posts
    442
    Thanks
    63
    Thanked 64 Times in 57
    Posts

    Default Re: Bathroom project - Work in progress

    Woohoo,bath has arrived.





    I also did a bit of boxing out in the downstairs cloakroom ready to tile/fit concealed cistern loo/sink






    AND.. I decided to tile the kitchen! First ever time tiling a wall... not too bad I hope!











    absolute nightmare as no walls were straight! im just about to finish the window surround today, then i'll grout in a few days once fully dry!

  10. The Following User Says Thank You to davemul For This Useful Post:


  11. #8
    Tilers Forums Arms Member
    Bolter's Avatar
    Join Date
    Sep 2008
    Location
    Northants - UK
    Posts
    939
    Thanks
    340
    Thanked 344 Times in 225
    Posts

    Default Re: Bathroom project - Work in progress

    Subscribing to this thread..........now!

  12. #9
    Regular TilersForums Contributor davemul's Avatar
    Join Date
    May 2011
    Location
    Kent
    Posts
    442
    Thanks
    63
    Thanked 64 Times in 57
    Posts

    Default Re: Bathroom project - Work in progress

    Few more niggly things done.. kitchen is fully tiled now, no pics as need to grout it all.












  13. The Following User Says Thank You to davemul For This Useful Post:


  14. #10
    TilersForums Contributor
    PHG Wetrooms's Avatar
    Join Date
    Jul 2009
    Location
    County Durham
    Posts
    97
    Thanks
    1
    Thanked 32 Times in 27
    Posts

    Default Re: Bathroom project - Work in progress

    Hi Davemul,

    Nice project, curious as to what shower tray former you are using. Have you put it straight onto joists?

  15. #11
    Regular TilersForums Contributor davemul's Avatar
    Join Date
    May 2011
    Location
    Kent
    Posts
    442
    Thanks
    63
    Thanked 64 Times in 57
    Posts

    Default Re: Bathroom project - Work in progress

    Hiya.. Marmox showerstone. Direct to joists but with support tray for the gully hole

  16. #12
    TilersForums Contributor
    PHG Wetrooms's Avatar
    Join Date
    Jul 2009
    Location
    County Durham
    Posts
    97
    Thanks
    1
    Thanked 32 Times in 27
    Posts

    Default Re: Bathroom project - Work in progress

    Good one..
    I was slightly concerned when i saw the pic of the underside of the tray with the cut-out for the pipe that it might of been foam cored as per the Showerlay tray and would need full support.
    Look forward to seeing the ongoing pics

  17. #13
    Regular TilersForums Contributor davemul's Avatar
    Join Date
    May 2011
    Location
    Kent
    Posts
    442
    Thanks
    63
    Thanked 64 Times in 57
    Posts

    Default Re: Bathroom project - Work in progress

    Started to plumb the shower pump and flow sensors for the dry deck today. Better not leak!













    did some plumbing for the shower mixer and some electrics also... more pics tomorrow

    this bathroom lark is stressful!

  18. The Following User Says Thank You to davemul For This Useful Post:


  19. #14
    Regular TilersForums Contributor impish's Avatar
    Join Date
    Apr 2011
    Location
    Lancashire
    Posts
    208
    Thanks
    6
    Thanked 16 Times in 14
    Posts

    Default Re: Bathroom project - Work in progress

    Have to say I'm impressed with the plumbing!
    Do you opt for push fit over soldering for the same reason I do: insurance?!

  20. #15
    Regular TilersForums Contributor davemul's Avatar
    Join Date
    May 2011
    Location
    Kent
    Posts
    442
    Thanks
    63
    Thanked 64 Times in 57
    Posts

    Default Re: Bathroom project - Work in progress

    Pushfit for ease in my situation. I'm only using compression where its a last resort and im no plumber so am not going near solder!

    Only problem is copper pushfits are so expensive! I reckon ive spent £800 in fittings and pipe alone so far!

  21. #16
    Regular TilersForums Contributor impish's Avatar
    Join Date
    Apr 2011
    Location
    Lancashire
    Posts
    208
    Thanks
    6
    Thanked 16 Times in 14
    Posts

    Default Re: Bathroom project - Work in progress

    I either use a local plumbers merchant for speedfix (plastic) or B&Q trade section if I am out of town for similar prices.
    I use speedfix on copper pipe - I'm NO plumber either, but I'm insured and I know what I'm doing - kind of!

    (Those copper pushfit are about four times the price of speedfix at a merchants)

  22. #17
    Regular TilersForums Contributor davemul's Avatar
    Join Date
    May 2011
    Location
    Kent
    Posts
    442
    Thanks
    63
    Thanked 64 Times in 57
    Posts

    Default Re: Bathroom project - Work in progress

    Riiighty ho.... Today I have been a proper bender!



    Pipe bender that is!

    Shower mixer/thermostat hot and colds are fully plumbed from the new pump

    Shower head fitting is also plumbed

    Tomorrow i'll route the pipework for the bath taps, cap them off and then turn the water on and try and fix all the leaks!

    bit concerned with the shower mixer but I used a good few loops of gas ptfe tape on the screw in unions and they went in pretty tight so fingers crossed!















    and the mess that is my desk.. where I try to work things for this damn bathroom out! oh and ask questions to you kind folk on here of course!


  23. The Following User Says Thank You to davemul For This Useful Post:


  24. #18
    Regular TilersForums Contributor davemul's Avatar
    Join Date
    May 2011
    Location
    Kent
    Posts
    442
    Thanks
    63
    Thanked 64 Times in 57
    Posts

    Default Re: Bathroom project - Work in progress

    Finally, all the plumbing / re routing is finished. It's all tested too. Shower turns pump on, no leaks anywhere (touches wood)


    Pipes done, just sorting some extra wiring / tidying up the old stuff too. Previous installer had it running everywhere and not clipped anywhere!


    insulated the hot water pipes too. Have left the cold and shower waste pipes. Had to add a few noggins to support the edges of where the plywood will meet and the perimeter of the marmox wet room tray











    Next I layed some insulation in between the joists. Not over any cables now they have been tidied up and clipped to the joists. HOW ITCHY! very itchy!





    Started to prime the underside and edges of the WBP ready to lay





    WBP now fixed. Every 150 centres. Used a lot of screws!








    Most of the electrics now in, apart from some final clipping, I should be ready to test / set up the dry deck once ive fixed the wet room tray/gulley. Added a light in the cupboard aswell that comes on when door opens as it was getting dark in there!








    next step.. laying the marmox boards and tanking!

  25. The Following User Says Thank You to davemul For This Useful Post:


  26. #19
    Tilers Forums Arms Member
    Bolter's Avatar
    Join Date
    Sep 2008
    Location
    Northants - UK
    Posts
    939
    Thanks
    340
    Thanked 344 Times in 225
    Posts

    Default Re: Bathroom project - Work in progress

    Good work Dave!

  27. #20
    Regular TilersForums Contributor davemul's Avatar
    Join Date
    May 2011
    Location
    Kent
    Posts
    442
    Thanks
    63
    Thanked 64 Times in 57
    Posts

    Default Re: Bathroom project - Work in progress

    Now i'm no carpenter and it shows, but I made the concealed cistern frame today





    golddigger likes this.

  28. The Following User Says Thank You to davemul For This Useful Post:


  29. #21
    Tilers Forums Arms Member

    Mike's Avatar
    Join Date
    Dec 2009
    Location
    Holyhead, wales
    Posts
    3,290
    Thanks
    272
    Thanked 629 Times in 495
    Posts

    Default Re: Bathroom project - Work in progress

    nice work, i'd lag that toilet wall with rockwool for sound proofing before boarding it

  30. #22
    Regular TilersForums Contributor davemul's Avatar
    Join Date
    May 2011
    Location
    Kent
    Posts
    442
    Thanks
    63
    Thanked 64 Times in 57
    Posts

    Default Re: Bathroom project - Work in progress

    Thanks Mike. Its hard to see but its all insulated behind that one peice of plywood. I have 2 big rolls ready for when I board the walls

  31. #23
    Tilers Forums Arms Member

    Mike's Avatar
    Join Date
    Dec 2009
    Location
    Holyhead, wales
    Posts
    3,290
    Thanks
    272
    Thanked 629 Times in 495
    Posts

    Default Re: Bathroom project - Work in progress

    all done to the book, nice to see. do it properly, do it once!

  32. #24
    Regular TilersForums Contributor davemul's Avatar
    Join Date
    May 2011
    Location
    Kent
    Posts
    442
    Thanks
    63
    Thanked 64 Times in 57
    Posts

    Default Re: Bathroom project - Work in progress

    Time to fit the Marmox showerstone tray..... and tiled gulley for pumped waste








  33. The Following User Says Thank You to davemul For This Useful Post:


  34. #25
    Regular TilersForums Contributor davemul's Avatar
    Join Date
    May 2011
    Location
    Kent
    Posts
    442
    Thanks
    63
    Thanked 64 Times in 57
    Posts

    Default Re: Bathroom project - Work in progress

    Fixed the entrance by replacing knackered boards with 18mm ply.. the fein has been a lifesaver during this project!

    Also measured and cut the marmox backer boards. Just need to mark where the pipes/cables are then its adhesive time!







    Bolter likes this.

  35. The Following User Says Thank You to davemul For This Useful Post:


  36. #26
    tfs
    tfs is offline
    Tilers Forums Arms Member
    tfs's Avatar
    Join Date
    Nov 2007
    Location
    West Lothian
    Posts
    1,588
    Thanks
    290
    Thanked 456 Times in 332
    Posts

    Default Re: Bathroom project - Work in progress

    No expense spared on this job by the looks of it mate!

    Good work

  37. #27
    Regular TilersForums Contributor davemul's Avatar
    Join Date
    May 2011
    Location
    Kent
    Posts
    442
    Thanks
    63
    Thanked 64 Times in 57
    Posts

    Default Re: Bathroom project - Work in progress

    Thanks mate

    just finished sticking down the boards and screwing... PHEW is all I can say. Went pretty well. Just letting things dry.

    Might change career the way i'm going!

  38. #28
    Regular TilersForums Contributor Bathfix Bob's Avatar
    Join Date
    Jan 2009
    Posts
    388
    Thanks
    209
    Thanked 77 Times in 50
    Posts

    Default Re: Bathroom project - Work in progress

    Hi Dave, nice job mate. I cant wait to see pics when its done, I'm especially looking forward to seeing the glowing toilet flush button.

    Grohe gear is top notch but damn expensive, worth the money though.

    Is the bath mixer fed from unbalanced feeds? eg cold from mains and gravity hot, if so dont forget the non return valve on the hot to prevent cold entering the hot water system, which it will because of the higher cold pressure. It will push hot water back into the cylinder and back up into the loft tank and then pour out of the overflow. Granted it will only do this when your using hot and cold together, or if it develops an internal fault.

    Many a young plumber has been caught out with that one, they keep replacing ballvalve washers but cant understand why the tank keeps filling!

    Make sure you use the low pressure flap type or it will restrict the flow. Get them from BES Plumbing.


    Plumbing Supplies | BES Gas & Plumbing Fittings Part 7463
    Last edited by Bathfix Bob; 22-08-2011 at 06:57 AM.

  39. The Following 2 Users Say Thank You to Bathfix Bob For This Useful Post:

    blocko (22-08-2011), davemul (22-08-2011)

  40. #29
    Regular TilersForums Contributor davemul's Avatar
    Join Date
    May 2011
    Location
    Kent
    Posts
    442
    Thanks
    63
    Thanked 64 Times in 57
    Posts

    Default Re: Bathroom project - Work in progress

    Hi Bob, thanks mate

    Cold feed to the bath is from the water tank in the loft (which then goes on to feed the pump then on to the shower). Hot water cylinder is also fed from a tank in the loft too mate.

    Sound ok?

  41. #30
    Regular TilersForums Contributor davemul's Avatar
    Join Date
    May 2011
    Location
    Kent
    Posts
    442
    Thanks
    63
    Thanked 64 Times in 57
    Posts

    Default Re: Bathroom project - Work in progress

    oh and i bet you are all TOTALLY fed up of pictures of the floor, so the last ones for the time being. All stuck down with SPF and screwed with washers as I went along. Also Sealant in between each board. Will tape then paint with mapegum later.




  42. The Following User Says Thank You to davemul For This Useful Post:


Page 1 of 11 12345 ... LastLast

Similar Threads

  1. Setting Out My first bathroom project
    By Supercoley1 in forum Tiling Forum
    Replies: 82
    Last Post: 10-10-2010, 11:07 PM
  2. My first bathroom project
    By MPC in forum Tiling Forum
    Replies: 7
    Last Post: 30-08-2010, 01:50 PM
  3. Replies: 48
    Last Post: 25-07-2010, 08:01 PM
  4. Bathroom project, (only tiled once before)
    By ronaldbiggs in forum Tiling Forum
    Replies: 44
    Last Post: 01-02-2009, 05:11 PM
  5. My bathroom project
    By Impossible in forum Tiling Forum
    Replies: 37
    Last Post: 02-05-2008, 02:06 PM

Visitors found this page by searching for:

site:tilersforums.co.uk forum jasmine grout

tiled concealed cistern

jasmine mapei

kerapoxy jasmin

isolation valve shower mixer

shower pump installation

3ie towel rail forum

kwikstick tiling

site:tilersforums.co.uk pictures of first time tiling

http:www.tilersforums.co.uktiling-forum51004-bathroom-project-work-progress.html

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Tilers Forums is the UK's largest wall and floor tiling forum. Advice is provided free of charge to all users. Tilers Forums does not take responsibility for any loss or damage caused due to following advice found on this forum. All wall and floor tiling should be carried out by a qualified wall and floor tiler. Views expressed on this forum are of the users and not Tilers Forums. Views expressed on this tiling forum are of the contributor only and not the forum as a whole. Not all views should be taken as fact but simply the opinion of the person posting. Readers are reminded to seek professional advice before undertaking any wall and floor tiling project.

Tilers Forums is a Trading Style of Untold Developments Ltd. Search Engine Optimisation, Web Development and Online Marketing for the UK.
DMCA.com
[Output: 218.99 Kb. compressed to 193.81 Kb. by saving 25.18 Kb. (11.50%)]

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28