Hi Tf members..
Have you any interesting jobs lined up for next 2 weeks leading to xmas..?
Welcome to Tilers Forums Tiling Forum
The UK's Biggest Tiling Forum for DIY and Professional Tilers; find
DIY and Professional Wall and Floor Tilers are Welcome
Advice from by Tilers, Manufacturers, Distributors and Tile Suppliers
p.s.: Registered members will not see this ad



Hi Tf members..
Have you any interesting jobs lined up for next 2 weeks leading to xmas..?



I got a consevatory floor about 15 m2.
Then in another house,
2 bathrooms ,walls and floors with UFH in both.
A kitchen extension in the same house.
I cant see me getting it all done but its ok as they understand and it gives me something to drop onto after xmas.
Wall and floor tiler in the West Midlands, Dudley, Stourbridge. www.nptiling.co.uk
Dave (12-12-2010)
Full bathroom fit, including pumped shower over wet floor. Fully tiled walls and floor, ceiling reboard and skim and floor rebuild.
Dave (12-12-2010)


well on fri i had naff all to do till xmas......but manage to pick up a kitchen spashy for mon, kitchen floor on tues and a bathroom walls with a feature slate mosic wall to finish the week managed to get these jobs on fri afternoon luckly enough......going to finish for xmas at the end of the week to look after the kids and try and get some work in for after xmas.
andy-allen-tiling
Wall and Floor Tiler based in Gloucester and covering Cheltenham-Forest of Dean-Stroud-Tewksbury-The Cotswolds.
Full bathroom fitting service, including all plumbing, plastering, and electrical installations, Free advice and design.
tel.........01452 721112
mobile...07976883412
web site..... www.andy-allen-tiling.co.uk
ANY TILE-ANY SURFACE-ANYWHERE
Dave (12-12-2010)


3 bathrooms to fully finish, one with custom build curved wedi enclosure.
its head to the grindstone time.
Dave (12-12-2010)

just a few odds and sods to finish off for me

Helping a plumber friend out with a few bathroom renovations.
Just had a bathroom floor cancelled that was to be done during the week.
Last edited by tfs; 12-12-2010 at 02:23 PM.



Kitchen splash to do mon/tues, then start 32m of 20mm limestone to take me up to Christmas. Hopefully have that done by 23rd so I can have a couple of drinks on Christmas eve with a few friends who are coming back for the holidays.
Start the next house should be done by mid Feb not such a mess a last the last house so im taking it easy get it on the market early March / depends when the sun starts shining again might wait till the B&Q adverts start for easter


just started my last showerroom,almond green glass and white ceramics with ice white glitter grout im looking forward to this one
that is me finished for xmas after that yipppeeee


All run of the mill tiling jobs right up to the holidays, but have a pool surround to rip-out and replace straight after the break and the customer really wants me to do it before Xmas, but it's physically impossible, no matter how much money they offer....
"The early bird catches the worm.... but it's the second mouse that gets the cheese"



Yes, small commissions, really nice to do and each very different from the next, so very happy![]()



Well Dave - I just finished my last bathroom today and tomorrow its an early morning business flight off to Barcelona for 5 days.
I've been asked to inspect some mosaic work by a bloke called Gaudi - Spanish I think, so no doubt it will be as rough as a badgers backside. However its meant to be pretty old and colourful so I'll take the phone camera and show you the state of affairs.
Oh by the way, part of team timeless - Mrs timeless - is also going (something to do with marketing ideas) so as usual it's all work!
Only one week till the big man in red day when we get back so just enough time to chill out, spend some home time in the studio and crack on with a bit of 'proper' mosaic work.
2011 - seems to be starting well - 7 bathrooms for a local company spaced over the first month so that should give us about 3 weeks work.
Dave -you and your family have a GOOD XMAS and thanks for all the contacts you have passed our way
NEW YEARS RESOLUTION - just in case I'am away - Must try harder to NOT upset anyone.![]()
find us : www.tilernewcastle.co.uk visit us : www.timelesstilingsolutions.com
' CREATING TIMELESS WALLS & FLOORS - CREATING TIMELESS WALLS & FLOORS '



All the best to you and yours John.. Enjoy Barcelona.. beautiful place and full of character.. I personally liked the Palace fountains..
timeless john (12-12-2010)



A bathroom and on-suite to tile, prep work, plastering side, the on-suite is bigger than the bath room..
Can't see me finishing before xmas though
"Experience is simply the name we give our mistakes"
4 kitchens to finish plus another one passed onto me today after customer rang to say they dont want the fitter i arranged to fit there kitchen to do the job
Michael Howe..Specialist Kitchen/bedroom and bathroom installations.



find us : www.tilernewcastle.co.uk visit us : www.timelesstilingsolutions.com
' CREATING TIMELESS WALLS & FLOORS - CREATING TIMELESS WALLS & FLOORS '



I don't believe your Norman no Mates John![]()
"Experience is simply the name we give our mistakes"
timeless john (12-12-2010)
John, if you didn't upset anyone, what would us mods and admin do??, we'd be useless!![]()
timeless john (12-12-2010)




I'm back to a renovation tomorrow, back hallway floor, utility floor, bathroom floor,skirted, marble handmade 90 degree windowboard and bath surround all to do. Shower after Christmas as wall needs finished by plumbers. After that I have a 80 m2 floor area in 60x60 porcelain, but they might not want all done by Christmas which suits me. Other wee bits to squeeze in before the break for some spending money, lol
Hillhead Tiling Services 2012
Contact Joe @ http://www.hillheadtilingservices.co.uk/

kitchen floor,re grout bathroom floor,kitchen splashy in same house.(tiled splashy on Friday gone)
cloakroom walls and floor.
kitchen splashy.
toilet regrout and tile floor.
should get most of it done for Friday.
Working over Christmas and new year with my taxi.(hopefully kerching!!!!!!)
TilersForums.co.uk
Friendly, Free, Facts on all tiling related issues.



You cab driving then Brian, Kerching ???????
"Experience is simply the name we give our mistakes"


kerching means quids in mark
whitebeam (12-12-2010)


Finishing off a job this week. then starting next week for an interior designer, I have a very large bathroom to do in a mixture of limestone and pebbles and glass mosaics, the design of it is too have pathways going threw the floor areas leading onto a beech design, (unless the design has changed again) cant give too much away as i will post piccies at a later date but it should be something a bit different! Then theres the kitchen and stairs leading down to the basement again in limestone with alot off bull noseing going on here this should be quite good too. and then when the weather gets better im going back to do the outside areas which all i know at the moment is in stone and it has to have a wow factor! I havent seen the latest design yet for this area as this has changed too but the last one was looking fab.
off monday tues fire hearth to take off tiles and replace, wed 10m2 kitchen floor thurs/fri 24m2 bathroom walls/floor
following monday 21m2 bathroom walls/floor then easy week if nothing else comes in![]()
Bookmarks