Thanks Tom. bathroom 2 was approx 20m2 floor to ceiling with border, plus the actual floor too.
It took me around 40 - 50 hours, but that was in fits and starts as easing into tiling from existing job.
Bathroom 3 is smaller but more fiddly. Suppose I just want to run before I can walk. I take your point about the level of disruptuion though and will bear that in mind on next job.
This Forum is a big help to me
