Welcome to Tilers Forums Tiling Forum


The UK's Biggest Tiling Forum for DIY and Professional Tilers; find


  •  » Tile Advice for Bathroom Tiles, Kitchen Tiles, Wall Tiles, Floor Tiles
  •  » Customers can Find a Tiler, or Wall and Floor Tilers can Find Customers
  •  » Tiling Tools, Tile Adhesive, Tile Grout and other Tile Products
  •  » Advice and Discussion related to Tiling Courses and Tiling NVQ's
  •  » Professional Tilers can find Business Advice, Discounts, Trade Accounts

DIY and Professional Wall and Floor Tilers are Welcome


Advice from by Tilers, Manufacturers, Distributors and Tile Suppliers


REGISTER HERE FOR FREE


p.s.: Registered members will not see this ad

Results 1 to 6 of 6
Discuss Advice on floor prep! in the Tiling Forum at TilersForums; Hello all, I will shortly be starting a DIY kitchen refit but have a question regarding sorting out a split level floor in our current kitchen/diner. The current kitchen floor ...
          
  1. #1
    Tilers Forums Arms Member PGM Tiling Solutions's Avatar
    Join Date
    Apr 2008
    Location
    Bude, Cornwall
    Posts
    65
    Thanks
    88
    Thanked 24 Times in 17
    Posts

    Default Advice on floor prep!

    Hello all,

    I will shortly be starting a DIY kitchen refit but have a question regarding sorting out a split level floor in our current kitchen/diner. The current kitchen floor is 4 and a 1/2 inches lower than the dining room and both floors have been tiled previoulsy (very poorly!). The plan is to make the kitchen the dining room and vice versa and when the new kitchen is in we want to tile the floor again. Both floors are concrete and a DPM has been laid previously.

    Anyway........I have read loads of posts/threads ref flooring and was wondering how others would approach this project.

    Option 1: Is to remove the existing tiles and raise the floor the required amount with concrete over insulation board then SLC. I would also then need to use an uncoupling membrane between the 2 rooms.

    Option 2: Remove existing tiles and fit wooden joists and secure with anchor bolts to the concrete floor. Fit noggins every 300mm and then screw 25mm marine ply or hardibacker boards (also lay insulation board). Again, use an uncoupling membrane between the 2 rooms.

    The major problem that I have with this job is that I am only home at weekends and will not be able to put the current kitchen out of use completely while a concete floor sets.

    Any advice or hints will be gratfully recieved!

    Cheers

    Paul

  2. #2
    doug boardley
    Guest doug boardley's Avatar

    Default Re: Advice on floor prep!

    If I'm reading this properly, I'd be inclined to remove all tiles, raise the lower floor with a concrete screed then use 10mm insulation boards (available from U-heat) right through both rooms. Where the new screed meets the existing higher floor I'd form an expansion joint in the screed and use an expansion strip here. Hope this helps.

  3. The Following User Says Thank You to doug boardley For This Useful Post:

    PGM Tiling Solutions (02-11-2010)

  4. #3
    Tilers Forums Arms Member
    diamondtiling's Avatar
    Join Date
    Jun 2009
    Location
    cheshire
    Posts
    6,859
    Thanks
    4,735
    Thanked 3,022 Times in 1,991
    Posts

    Default Re: Advice on floor prep!

    Quote Originally Posted by doug boardley View Post
    If I'm reading this properly, I'd be inclined to remove all tiles, raise the lower floor with a concrete screed then use 10mm insulation boards (available from U-heat) right through both rooms. Where the new screed meets the existing higher floor I'd form an expansion joint in the screed and use an expansion strip here. Hope this helps.

    Cant add anything to that Bomber.


  5. #4
    Regular TilersForums Contributor

    365drills's Avatar
    Join Date
    May 2007
    Location
    Live in London
    Posts
    2,514
    Thanks
    315
    Thanked 869 Times in 544
    Posts

    Default Re: Advice on floor prep!

    On my own kitchen floor I has a split level too.

    Level one was old screeded concretr.
    Level two was a lower level wooden floor with a snooker table!

    Having got rid of the snooker table I dug up the wooden floor. Laid a membrane. Filled it with bricks and rubble. Dumped cement into it and let it go off for 6 weeks. We then had it screeded 5 inches to the other floor.

    Waited 3 weeks. Then had the entire floor fibreglass reinforced (very smelly - and knocks you out). On top of that had a 5mm latex resin pour mixture which took 2 weeks to set fully. AND THEN we put the kitchen in. Total time spent 11 weeks.



    The result of the latex screen across two previous levels brought up to meet with a screed.



    Final result of the latex resin.

    So I think your tile project will be a lot quicker !
    Richard Hazell - Diamond Tile Drills
    Decent reliable gear that wont let you down
    01992-410636 0777 366 4519
    richard@365drills.com
    http://www.365drills.com
    Tile Drills

  6. #5
    Tilers Forums Arms Member PGM Tiling Solutions's Avatar
    Join Date
    Apr 2008
    Location
    Bude, Cornwall
    Posts
    65
    Thanks
    88
    Thanked 24 Times in 17
    Posts

    Default Re: Advice on floor prep!

    Thanks for the replies and advice gven by all. That's a pretty impressive end result 365! Concrete it is then! Only problem is that if I raise both floors with insulation board it will create a step from the hallway which leads straight through. I'm thinking to concrete and insulation board the lower floor and go with the expansion joint. Might be a silly question but.....! Will I need to SLC on the insulation board or just make sure I get my concrete height bang on and level?

    Thanks again

    Paul

  7. #6
    Tilers Forums Arms Member Sean Kelly's Avatar
    Join Date
    Mar 2008
    Location
    Ruislip
    Posts
    643
    Thanks
    102
    Thanked 245 Times in 118
    Posts

    Default Re: Advice on floor prep!

    Lovely kitchen Richard. I was looking at another post of your and wondered what the floor was made of. Have you got any tiles in your kitchen?? Looks like you are in for a healthy lunch. Cheers Sean
    A Year In The Life Of A New Tiler.
    Contact nbr: 01895 472 312
    Mobile: 07900 993 111

Similar Threads

  1. prep advice please
    By connors12345 in forum Tile Adhesive, Grout and Substrate Preparation
    Replies: 4
    Last Post: 06-05-2010, 06:55 PM
  2. concrete floor prep and SLC prep
    By RodgerQ in forum Tile Adhesive, Grout and Substrate Preparation
    Replies: 20
    Last Post: 26-04-2010, 08:39 PM
  3. Advice on prep.
    By micdunabie in forum Tile Adhesive, Grout and Substrate Preparation
    Replies: 5
    Last Post: 13-09-2009, 10:18 PM
  4. Slate floor final prep before sealing (and sealing advice)
    By Easty in forum Tile Adhesive, Grout and Substrate Preparation
    Replies: 9
    Last Post: 22-06-2009, 08:18 PM
  5. Advice on prep
    By ceramic steve in forum Tile Adhesive, Grout and Substrate Preparation
    Replies: 1
    Last Post: 25-08-2008, 09:37 AM

Visitors found this page by searching for:

Nobody landed on this page from a search engine, yet!

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Tilers Forums is the UK's largest wall and floor tiling forum. Advice is provided free of charge to all users. Tilers Forums does not take responsibility for any loss or damage caused due to following advice found on this forum. All wall and floor tiling should be carried out by a qualified wall and floor tiler. Views expressed on this forum are of the users and not Tilers Forums. Views expressed on this tiling forum are of the contributor only and not the forum as a whole. Not all views should be taken as fact but simply the opinion of the person posting. Readers are reminded to seek professional advice before undertaking any wall and floor tiling project.

Tilers Forums is a Trading Style of Untold Developments Ltd. Search Engine Optimisation, Web Development and Online Marketing for the UK.
DMCA.com
[Output: 80.37 Kb. compressed to 73.31 Kb. by saving 7.06 Kb. (8.79%)]

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28