i'll be tiling pool we have had lots of probs with leaks, to fix Due to builders knot knowing there stuffstill its all money!!
they even built it over a well
![]()
Welcome to Tilers Forums Tiling Forum
The UK's Biggest Tiling Forum for DIY and Professional Tilers; find
DIY and Professional Wall and Floor Tilers are Welcome
Advice from by Tilers, Manufacturers, Distributors and Tile Suppliers
p.s.: Registered members will not see this ad

i'll be tiling pool we have had lots of probs with leaks, to fix Due to builders knot knowing there stuffstill its all money!!
they even built it over a well
![]()
WEB http://www.diamondpoolfinishers.co.uk/ YOU TUBE http://www.youtube.com/user/MrGooner59 POOL TILE ADVICE http://www.scribd.com/doc/73214640/A...WIMMING-POOL’S



That would be a WELL good pool then..![]()


lol,this week im finishing the bathroom where the couple are now divorcing lol,and then a bathroom for a bathroom co nice little ceramic jobs


How and where do you start with a pool leak ? how they hell do you identify where the leak / s are ? anywho, same sort of week for me atm, w.c. walls, kitchen floor, and a bathroom walls and en-suite walls to do, and anything else I can squeeze in, don't think I'll manage any more as I'm going back home Friday for lil Sister's 40th


Two floor to do tomorrow.... one of them started last week, but customer wants a strange design on the out side of the boarder, so I gave him the weekend to think about what he's asking. The other was also prepped last week and will tile tomorrow then grout Tuesday morning. Then I'm off down to Yorkshire for the rest of the week to visit family and let them know we're having another baby (about time as Fiona is five months pregnant.......)
AndyBob. (24-10-2010)
Stewart (24-10-2010)


lol,nice one
top news there Stewart, well donei'm so jealous of all pregnant ladies at the moment!



Your time will come liz..
GirlRacerRed (24-10-2010)



Congrats on the baby news Stewart. I've got an 80m2 marble floor to lay this week! Got my wifes 17 year old younger brother labouring for me as its half term, he's going to be a tired little boy by friday lugging 60 x 40's around. How is work in general for everyone? Much on?
Stewart (24-10-2010)

Nice one Stewart,
Meeting the lads at Shildon on Monday, then a cloakroom to fit and tile rest of the week




Nice one Stewart
Tomorrow i'm back to a new build(9 days there already),i have ground floor all tiled(89m2 600x600 polished porcelain).Ensuite walls and floor finished,
bathroom i have floor and walls(inc 2 marble slabs as shower walls).
Mosaic floor in shower area tomorrow and bottom cuts then grouting plus i have steps to dining room to tile so tuesday early for finish i hope.
Then a 8m2 floor to ditra and tile wednesday(well priced).
Thursday/friday/saturday not sure yet,either bathroom 30 miles away of a marble bathroom and ensuite 14 miles away,plenty in pipe now with a 90m2 600x600x20mm polished marble floor to start in 2 weeks and full houses after that.Picking up nicely here so hope everyone else is good too![]()
Hillhead Tiling Services 2012
Contact Joe @ http://www.hillheadtilingservices.co.uk/

easy really mate because the pool is under-construction there should -not be any water comeing in to the pool while we are render/tiling but there was!!! so you have to stop it ,because what comes in will go out when full of bathing waterand the builders should have built a de-watering system to stop ground water getting to the shell !!
they did notso now they are trying to build one!!lol fools
good luck and great new's stew!
![]()
Last edited by Diamond Pool Finishers; 24-10-2010 at 08:00 PM.
WEB http://www.diamondpoolfinishers.co.uk/ YOU TUBE http://www.youtube.com/user/MrGooner59 POOL TILE ADVICE http://www.scribd.com/doc/73214640/A...WIMMING-POOL’S
Stewart (24-10-2010)
school half term, so I'll be daddy-day care this week, got a kitchen splashie to do for my boys ex-teacher so I might take them along with me to do it one day this week![]()
AndyBob. (24-10-2010)

Been working in a brewery last week and back there in the morning, its been pretty brutal working hard all day and all you can smell is the beer/ ale. I have had a few beers every night when I get home as a result!
AndyBob. (24-10-2010)



congrats Stew on the good news , I have to finish a small porcelain bathroon in 60x30 walls and 60 x 60 floor ,start a porcenalosa tile bathroom 900x300 ,also have an easy kitchen splash back on Thurs less than 3m2 work, looking forward to that as i havent tiled one in over a year, its local and for an old customer ,so happy days
wetroom to get ready for my little bruv and then a kitchen to finish of when the new granite tops are fitted and i hope the customer likes them this time around
Michael Howe..Specialist Kitchen/bedroom and bathroom installations.
Dave (24-10-2010)



Congrats Stew on the future member to the family![]()
"Experience is simply the name we give our mistakes"
Stewart (24-10-2010)



Good news Stewartcongrats
![]()
philhobsontiler@live.co.uk
07711 310 960
Measure twice cut once
www.philhobsontiler.co.uk
http://www.youtube.com/watch?v=y0i8NYD-QgE
http://www.youtube.com/watch?v=sg7qjC_C8AM

Daytime TV still.
Still not fit enough to get back to work..........and have jobs stacking up.



Kitchen walls to finish putting the tiles on first thing tomorrow morning, then the Anhydrite training day at PHG..
Then Tuesday grout the walls and start the granite floor and then the rest of the week, Tank and tile the wetroom strummer is getting ready.



Take your time Col, I had one done a few years ago and was in no rush to get back to work.
"Experience is simply the name we give our mistakes"

congradulations Stu!
An easy way out is to encourage the misses to breast feed, less need for us to get up in the middle of the night
Only joking![]()
Great news StewMe and Mrs Doug where told that we probably wouldn't have kids, got two within a year of each other!!
![]()
Last edited by doug boardley; 24-10-2010 at 09:26 PM.

Pain in the rear customers, they are like buses, thay all arrive at the same time.
Dan (25-10-2010)
I'm spending my week sorting out xmas stuff... that's what I get for working in retail near xmas
I'm in for a full week off with the kids. shopping, mw2 and ear ache is what I've got on this week! congratulations stew![]()
Stewart (24-10-2010)
That's bloody brilliant news Stu mate! Both Liz and my Mrs are getting well twitchy about having a sprog. (They're not both to do with me lol - there's a Mr RacerRed and it isn't me).
I have a week of replying to emails, updating websites, and generally the same stuff as last week, the week before that, and the week before that.
Still got a bit of a backlog of general things to add to websites and whatnot since the upgrade of all the forums but as they're all working fine and dandy I don't want to mess with them haha
DanTilersForums.co.uk Owner
The UK's biggest Tiling Forum
Like TF? Try our other forums: The UK's biggest Electrical Forum, The UK's biggest Plumbing Forum, The UK's biggest Flooring Forum. Some newer trade-related forums; Plastering Forum, Building Forum, Decorating Forum.
Follow TilersForums on Twitter.
GirlRacerRed (25-10-2010)
I've spent the day sulking and feeling generally peeved!
Bookmarks