Welcome to Tilers Forums Tiling Forum


The UK's Biggest Tiling Forum for DIY and Professional Tilers; find


  •  » Tile Advice for Bathroom Tiles, Kitchen Tiles, Wall Tiles, Floor Tiles
  •  » Customers can Find a Tiler, or Wall and Floor Tilers can Find Customers
  •  » Tiling Tools, Tile Adhesive, Tile Grout and other Tile Products
  •  » Advice and Discussion related to Tiling Courses and Tiling NVQ's
  •  » Professional Tilers can find Business Advice, Discounts, Trade Accounts

DIY and Professional Wall and Floor Tilers are Welcome


Advice from by Tilers, Manufacturers, Distributors and Tile Suppliers


REGISTER HERE FOR FREE


p.s.: Registered members will not see this ad

Results 1 to 23 of 23
Discuss Trial By Bathroom in the Tiling Forum at TilersForums; I had a seemingly never-ending bathroom DIY experience which lasted several weeks from planning to (almost) completion. My first ever bathroom installation and tiling job - and probably my last ...
          
  1. #1
    TilersForums Contributor TheRealRobG's Avatar
    Join Date
    Mar 2010
    Posts
    69
    Thanks
    52
    Thanked 36 Times in 9
    Posts

    Default Trial By Bathroom

    I had a seemingly never-ending bathroom DIY experience which lasted several weeks from planning to (almost) completion. My first ever bathroom installation and tiling job - and probably my last for a good few years, too!
    I couldn't have done it without the generous advice I got from this forum, so thanks to everyone here for kind help and guidance. It made all the difference!

    Took a few piccies while I was doing it, and thought I might share them on here. I don't get much appreciation from the wife about what's involved anyway...

    As you can see, it started off as a pretty hideous 1980s style bathroom with corroded gold finish fittings and a nasty green carpet. I thought the tiles were salvageable, but the wife thought otherwise, so rip 'em all out I did!





    Unfortunately off with the tiles came most of the plasterboard, so I had to replace that, which took - bloody ages! I decided to use Aquapanel for most of the critical sections around the bath, toilet and shower.

    For the shower I ran a sheet of polythene behind the Aquapanel and ran that down into the tray in front of the upstand to catch any stray moisture. I had to construct a basin support and toilet cistern box from scratch. I used a Geberit WC frame for the suspended toilet.
















  2. The Following 4 Users Say Thank You to TheRealRobG For This Useful Post:

    Colour Republic (07-07-2010), macten (08-07-2010), merlecollins (07-07-2010), mikethetile (07-07-2010)

  3. #2
    TilersForums Contributor TheRealRobG's Avatar
    Join Date
    Mar 2010
    Posts
    69
    Thanks
    52
    Thanked 36 Times in 9
    Posts

    Default Re: Trial By Bathroom

    I'd decided to run round some mosaics to break up the larger tiles, and aimed at the level of the shower valve, so ran a baton round to leave the correct gap on all walls. I used a water-filled plastic tube as a level, and it worked a treat. I think a spinning laser might have been easier though!





    At one point while screwing down the floorboards securely I managed to run a screw into a pipe, and had to tear them up in a hurry before stuffing a couple of dozen toilet rolls and towels under the floor cavity to soak it all up...





    The tiling took an age - mostly because of the seemingly endless number of cuts I had to make. I was really pleased with the window. It came out exactly square along each edge, and I was able to apply a metal strip around it without any kinks. I'm pleased with the finish. I believe it was Homelux stainless strip. I actually ended up glueing it to the edge of the tiles using Araldite to make sure there were no gaps. Held it in place with a glue gun while the epoxy cured. Worked a treat. I cut the mitres on my tile cutter and finished them to size with a diamond file.






  4. The Following 4 Users Say Thank You to TheRealRobG For This Useful Post:

    Colour Republic (07-07-2010), macten (08-07-2010), merlecollins (07-07-2010), mikethetile (07-07-2010)

  5. #3
    TilersForums Contributor TheRealRobG's Avatar
    Join Date
    Mar 2010
    Posts
    69
    Thanks
    52
    Thanked 36 Times in 9
    Posts

    Default Re: Trial By Bathroom

    After the wall tiling came the floor. After the pipe was fixed and the rest of the plumbing mods complete, I finished screwing down the 22mm chipboard, adding a few extra noggings here and there to prevent flexing.

    Then I applied a layer of 12.5mm Aquapanel onto a bed of tile adhesive and screwed it down to the chipboard, checking that it was roughly level as I went.

    Then I applied the DeviMat underfloor heating.



    And applied a 6-8mm layer of self-levelling compound to cover it and level the floor up. I ran a length of wooden dowel around the edge of the floor to contain the compound, held in place with glue gun adhesive.



    Once that was in thoroughly set (about a week later) I laid the floor tiles and grouted them with matching grout.



    I was quite pleased with my mitred edges and corner on the basin shelf which were done with a fairly basic, placticky circular tile cutter:





    The shower valve. I used a Marflow ShowerPl8' for this as recommended by my plumber to keep the centres exactly in line. It worked perfectly.



    I found a great stainless steel wall mounted toilet brush made by Roper Rhodes which keeps everything off the floor just like the fittings.



    And voila! Finally all finished bar the underfloor heating being wired into the mains, which should be happening in the next couple of weeks with any luck!

    Last edited by TheRealRobG; 07-07-2010 at 12:30 AM.

  6. The Following 7 Users Say Thank You to TheRealRobG For This Useful Post:

    Colour Republic (07-07-2010), diamondtiling (07-07-2010), Ken Bruty (07-07-2010), macten (08-07-2010), merlecollins (07-07-2010), mikethetile (07-07-2010), Scott (07-07-2010)

  7. #4
    TilersForums Trusted Member
    Colour Republic's Avatar
    Join Date
    Jan 2009
    Location
    Brighton, East Sussex
    Posts
    6,328
    Thanks
    1,533
    Thanked 2,421 Times in 1,653
    Posts

    Default Re: Trial By Bathroom

    First bathroom!!! Looks like you've been doing it for years mate!

    methodical perfectionist

  8. The Following User Says Thank You to Colour Republic For This Useful Post:

    TheRealRobG (07-07-2010)

  9. #5
    TilersForums Trusted Member
    Colour Republic's Avatar
    Join Date
    Jan 2009
    Location
    Brighton, East Sussex
    Posts
    6,328
    Thanks
    1,533
    Thanked 2,421 Times in 1,653
    Posts

    Default Re: Trial By Bathroom

    Hang on I've just realised you're not a professional, I know over half the bathroom fitters in the uk wouldn't have turned out a job like that.

    You're a chippy right? or a cabinet maker? Please don't tell me you're a hairdresser or something!

    (nothing against hairdresser btw)
    Last edited by Colour Republic; 07-07-2010 at 12:48 AM.

  10. The Following User Says Thank You to Colour Republic For This Useful Post:

    TheRealRobG (07-07-2010)

  11. #6
    TilersForums Contributor TheRealRobG's Avatar
    Join Date
    Mar 2010
    Posts
    69
    Thanks
    52
    Thanked 36 Times in 9
    Posts

    Default Re: Trial By Bathroom

    Thanks!!!

    Nice to get appreciation from someone - the wife was just constantly nagging me to hurry up!

    I'm a computer boffin with an engineering degree actually, but I do have a passion for making things. Trouble is, I can only be arsed doing something once, then I get totally sick of it and vow never to do it again. One thing's for sure - I'd never make a living tiling or installing bathrooms - that lot took me weeks...!

  12. #7
    TilersForums Trusted Member
    Colour Republic's Avatar
    Join Date
    Jan 2009
    Location
    Brighton, East Sussex
    Posts
    6,328
    Thanks
    1,533
    Thanked 2,421 Times in 1,653
    Posts

    Default Re: Trial By Bathroom

    If you ever decide a change in career then you'd make it in this industry, I'd happily employ you, with practice comes speed, that really has blown me away that you don't work in the industry already. You even went out and bought professional tools i see from the Fat Max levels to the Makita to the professional painters skuttle, even your choice of materials and fittings is how they should be. Some of it is maybe a little over engineered but that's to be expected and to be honest how it should be for a lasting job.

    Blown away I really am

  13. The Following User Says Thank You to Colour Republic For This Useful Post:

    TheRealRobG (07-07-2010)

  14. #8
    Tilers Forums Arms Member

    Mike's Avatar
    Join Date
    Dec 2009
    Location
    Holyhead, wales
    Posts
    3,290
    Thanks
    272
    Thanked 629 Times in 495
    Posts

    Default Re: Trial By Bathroom

    brillant job mate, i'd be proud of that myself! nice attention to detail too

  15. The Following User Says Thank You to Mike For This Useful Post:

    TheRealRobG (07-07-2010)

  16. #9
    Tilers Forums Arms Member
    faithhealer's Avatar
    Join Date
    Apr 2007
    Location
    Sedgefield
    Posts
    8,280
    Thanks
    2,527
    Thanked 2,472 Times in 2,006
    Posts

    Default Re: Trial By Bathroom

    brilliant Rob, well done

  17. The Following User Says Thank You to faithhealer For This Useful Post:

    TheRealRobG (07-07-2010)

  18. #10
    Tilers Forums Arms Member
    diamondtiling's Avatar
    Join Date
    Jun 2009
    Location
    cheshire
    Posts
    6,859
    Thanks
    4,735
    Thanked 3,022 Times in 1,991
    Posts

    Default Re: Trial By Bathroom

    A very good and detailed job, you should be very proud of yourself.


  19. The Following User Says Thank You to diamondtiling For This Useful Post:

    TheRealRobG (07-07-2010)

  20. #11
    Tilers Forums Arms Member
    mikethetile's Avatar
    Join Date
    Feb 2009
    Location
    leighton buzzard
    Posts
    6,240
    Thanks
    2,776
    Thanked 3,070 Times in 2,107
    Posts

    Default Re: Trial By Bathroom

    Rob

    thats a job anyone would be pleased to have done themselves or have had done for them, you say it took a long time but it didnt really as you were doing it in your own time.

    every where you look you can see the thought and attention to detail that has gone into this job

    well done , enjoy your achievements and be proud of what you have achieved

    mike
    I know nothing I havent learnt
    Painters and decorator Leighton Buzzard 01525 376559/07594 779654

  21. The Following User Says Thank You to mikethetile For This Useful Post:

    TheRealRobG (07-07-2010)

  22. #12
    jay
    jay is offline
    TilersForums Trusted Member

    jay's Avatar
    Join Date
    Apr 2009
    Location
    Tasmania
    Posts
    8,022
    Thanks
    3,968
    Thanked 1,990 Times in 1,587
    Posts

    Default Re: Trial By Bathroom

    nice work

  23. The Following User Says Thank You to jay For This Useful Post:

    TheRealRobG (07-07-2010)

  24. #13
    Tool Hound


    Sir Ramic's Avatar
    Join Date
    Jan 2008
    Location
    Stourbridge, West Midlands
    Posts
    16,535
    Thanks
    1,471
    Thanked 5,604 Times in 3,566
    Posts
    Blog Entries
    2

    Default Re: Trial By Bathroom

    Cracking job Grommit
    Wall and floor tiler in the West Midlands, Dudley, Stourbridge. www.nptiling.co.uk

  25. The Following User Says Thank You to Sir Ramic For This Useful Post:

    TheRealRobG (07-07-2010)

  26. #14
    Tilers Forums Arms Member united's Avatar
    Join Date
    Nov 2009
    Location
    Sunderland
    Posts
    2,814
    Thanks
    987
    Thanked 1,194 Times in 866
    Posts

    Default Re: Trial By Bathroom

    Wow you should be really proud, that is some great work. Lovely finish and great prep work
    Mark
    Follow me on Twitter
    Tiler in Sunderland - Tiler in Tyne and Wear - Sunderland Tiler

  27. The Following User Says Thank You to united For This Useful Post:

    TheRealRobG (07-07-2010)

  28. #15
    Tilers Forums Arms Member stevee's Avatar
    Join Date
    Apr 2009
    Location
    deal,kent
    Posts
    800
    Thanks
    285
    Thanked 244 Times in 164
    Posts

    Default Re: Trial By Bathroom

    looks great bud

  29. The Following User Says Thank You to stevee For This Useful Post:

    TheRealRobG (07-07-2010)

  30. #16
    TilersForums Contributor TheRealRobG's Avatar
    Join Date
    Mar 2010
    Posts
    69
    Thanks
    52
    Thanked 36 Times in 9
    Posts

    Default Re: Trial By Bathroom

    Thanks everyone - I really appreciate the kind comments.

  31. #17
    Established Tiler
    Ken Bruty's Avatar
    Join Date
    Sep 2009
    Location
    Wellingborough, Northants
    Posts
    1,632
    Thanks
    976
    Thanked 500 Times in 393
    Posts

    Default Re: Trial By Bathroom

    Beautiful job Rob, I would be very pleased with that if I had done it.
    Tilers in Bedfordshire, Tilers in Northamptonshire, Tilers in Buckinghamshire
    www.kdbceramicsandstone.com

  32. The Following User Says Thank You to Ken Bruty For This Useful Post:

    TheRealRobG (07-07-2010)

  33. #18
    TilersForums Trusted Member


    Phil Hobson's Avatar
    Join Date
    Aug 2009
    Location
    oldham
    Posts
    7,225
    Thanks
    5,128
    Thanked 3,115 Times in 1,925
    Posts

    Default Re: Trial By Bathroom

    For a first attempt mate very good, tell your wife to read the above comments. She should be impressed

  34. The Following User Says Thank You to Phil Hobson For This Useful Post:

    TheRealRobG (07-07-2010)

  35. #19
    Tilers Forums Arms Member
    merlecollins's Avatar
    Join Date
    Nov 2008
    Location
    On a rock in the middle of the sea.
    Posts
    3,493
    Thanks
    1,177
    Thanked 1,675 Times in 1,079
    Posts

    Default Re: Trial By Bathroom

    Hey Rob, I'm proud of you my boy

    For a first bathroom undertaking you have without doubt dived in at the deep end with great success mate
    Statistically, 6 out of 7 dwarfs are not happy
    http://www.amazingtunes.com/

  36. The Following User Says Thank You to merlecollins For This Useful Post:

    TheRealRobG (07-07-2010)

  37. #20
    Tilers Forums Arms Member
    Scott's Avatar
    Join Date
    Feb 2010
    Location
    Leighton Buzzard
    Posts
    4,170
    Thanks
    1,651
    Thanked 1,395 Times in 1,052
    Posts

    Default Re: Trial By Bathroom

    Great job there mate, you can tell theres an engineer in there somewhere

  38. The Following User Says Thank You to Scott For This Useful Post:

    TheRealRobG (07-07-2010)

  39. #21
    Tilers Forums Arms Member SandyFloor's Avatar
    Join Date
    Sep 2009
    Location
    Ayrshire
    Posts
    2,380
    Thanks
    453
    Thanked 1,002 Times in 677
    Posts

    Default Re: Trial By Bathroom

    Well done, your job looks quite remarkable on especially for someone who doesn't work as a tradesman let alone a tiler/bathroom fitter. Your bathroom will still look good for years. If you ever did this again you'd do it in a fraction of the time just due to the experience of this one.

    I think you can be really proud of yourself.

  40. The Following User Says Thank You to SandyFloor For This Useful Post:

    TheRealRobG (07-07-2010)

  41. #22
    Tilers Forums Arms Member
    macten's Avatar
    Join Date
    Sep 2007
    Location
    Nottingham/Derby
    Posts
    1,417
    Thanks
    569
    Thanked 701 Times in 409
    Posts

    Default Re: Trial By Bathroom

    Amazing.
    Not just the finish but all the stuff no one will ever see.
    Once again, amazing!
    TradePerfect
    Plumbing and Tiling solutions for Derby and Nottingham
    tradeperfect@sky.com
    Tel: 0790 2036456

  42. The Following User Says Thank You to macten For This Useful Post:

    TheRealRobG (08-07-2010)

  43. #23
    Healthy TilersForums Contributor Burnsy's Avatar
    Join Date
    Feb 2008
    Location
    Heanor, Derbyshire
    Posts
    119
    Thanks
    8
    Thanked 24 Times in 19
    Posts

    Default Re: Trial By Bathroom

    That is some quality work there - well done

Similar Threads

  1. Replies: 48
    Last Post: 25-07-2010, 08:01 PM
  2. RIW tileSafe membrane in the bathroom
    By byvatov in forum Stone Tiling Forum
    Replies: 12
    Last Post: 27-05-2010, 12:19 PM
  3. Open Question: Tiling kitchen and bathroom?
    By Y! Answers in forum RSS Feeds
    Replies: 0
    Last Post: 17-07-2008, 09:00 AM
  4. Need advice on Bathroom job, quick!
    By Bernard in forum Tiling Forum
    Replies: 3
    Last Post: 29-01-2008, 06:42 PM
  5. Replies: 0
    Last Post: 20-11-2007, 10:40 PM

Visitors found this page by searching for:

Nobody landed on this page from a search engine, yet!

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Tilers Forums is the UK's largest wall and floor tiling forum. Advice is provided free of charge to all users. Tilers Forums does not take responsibility for any loss or damage caused due to following advice found on this forum. All wall and floor tiling should be carried out by a qualified wall and floor tiler. Views expressed on this forum are of the users and not Tilers Forums. Views expressed on this tiling forum are of the contributor only and not the forum as a whole. Not all views should be taken as fact but simply the opinion of the person posting. Readers are reminded to seek professional advice before undertaking any wall and floor tiling project.

Tilers Forums is a Trading Style of Untold Developments Ltd. Search Engine Optimisation, Web Development and Online Marketing for the UK.
DMCA.com
[Output: 184.38 Kb. compressed to 164.03 Kb. by saving 20.35 Kb. (11.04%)]

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28