Welcome to Tilers Forums Tiling Forum
The UK's Biggest Tiling Forum for DIY and Professional Tilers; find
- » Tile Advice for Bathroom Tiles, Kitchen Tiles, Wall Tiles, Floor Tiles
- » Customers can Find a Tiler, or Wall and Floor Tilers can Find Customers
- » Tiling Tools, Tile Adhesive, Tile Grout and other Tile Products
- » Advice and Discussion related to Tiling Courses and Tiling NVQ's
- » Professional Tilers can find Business Advice, Discounts, Trade Accounts
DIY and Professional Wall and Floor Tilers are Welcome
Advice from by Tilers, Manufacturers, Distributors and Tile Suppliers
REGISTER HERE FOR FREE
p.s.: Registered members will not see this ad
Discuss
Please give opinions on this tiling job in the
Tiling Forum at TilersForums;
Hi there
I'm new to this site, and sorry for not doing a formal introduction, but i really need some advice quickly.
I'm attaching some photos of tiling in a ... -
New TilersForums Contributor
-
-
Re: Please give opinions on this tiling job
that depends everyone has a different view some cut it into the line some cut it to a straight line some make horizontal does depend on several factors and thats hard to tell unless you are there :Pete
-
-
New TilersForums Contributor
Re: Please give opinions on this tiling job
Thanks for that, can you explain what the factors are that would affect it, as i'm waiting for him to call me and i'd like to sound vaguely knowledgeable if poss!
-
-
-
-
New TilersForums Contributor
Re: Please give opinions on this tiling job
Thanks for the welcome! Ummm, I'm rubbish at picturing what you're talking about, so excuse me for being a tad thick. What I would want is for the tiling to have been done a tad under where the roof joins the wall,so the angle of the roof doesn't impact it at all, and in a totally straight line, so when you look at it the tiling itself looks straight. Is this a possibility. Because looking at wonky tiling every day would drive me mad.
-
-
Re: Please give opinions on this tiling job
Hi Clare..the matter of tiling straight or following the natural join of the wall/ceiling is a personal choice and one I always give my clients the option to decide..In almost every case, the client opts to go with following the natural join..In one case, the client wanted the line straight but didn't want a gap showing, so we tiled it straight and then replastered the ceiling to make the join the same along the wall..but this work is on existing buildings..
As it's a new build, the work will obviosuly have to pass building control inspection and if the ceiling/wall line and tiling passes, then the tiler/developer is not obliged to change it..however, if a wonky row of tiles is stopping you buying/them selling, I'm sure you/they can reach a compromise and do something about it.. it's not difficult to replace a row of tiles/replaster a ceiling, to satisfy your requirement...
-
The Following User Says Thank You to Daveyboy For This Useful Post:
-
Re: Please give opinions on this tiling job
I must admit it does look naff!
Those tiles above the doorline highlight the slope.
Options to fix include reducing the height of the tiles so they are inline with the door jam.
Or moving the door jam to run the tile line. Its all about what the eye sees
-
-
-
The Following 2 Users Say Thank You to diamondtiling For This Useful Post:
tedley34 (27-07-2009), trevortine (28-07-2009)
-
Re: Please give opinions on this tiling job

Originally Posted by
CL66
..What I would want is for the tiling to have been done a tad under where the roof joins the wall,so the angle of the roof doesn't impact it at all, and in a totally straight line, so when you look at it the tiling itself looks straight. Is this a possibility. Because looking at wonky tiling every day would drive me mad.
The only trouble with that Clare is that you will have a horizontally level line of tiles and a wonky/unlevel ceiling/wall line....no matter how big a gap you leave between the two, the human eye will always notice that one of them is wrong and quite often it thinks it's the one that is actually level..
It's not clear how much of a say you have over what is going into this new build? If you are in control of the interior design/products and the developers are working to your specification, why haven't you specified what you want?
-
-
-
The Following User Says Thank You to Big D For This Useful Post:
diamondtiling (27-07-2009)
-
Re: Please give opinions on this tiling job
looks hideous. If I did that in my bathroom My Mrs would make sure I did it again. I think I would cut the tiles straight and have an uneven gap above which I would paint the same colour as the ceiling.
-
The Following User Says Thank You to Ajax123 For This Useful Post:
timeless john (27-07-2009)
-
Re: Please give opinions on this tiling job
Looks like they have lost the level down to the left ?
Have they cut the tiles on left above door ?
Why not remove thoose and continue tiling to ceiling ?
Hopefully won't end with a slither
Gary
Last edited by Alpha Omega; 27-07-2009 at 06:52 PM.
Reason: added comments
-
-
Re: Please give opinions on this tiling job

Originally Posted by
diamondtiling
Tiles do not come under the building control Inspector, If they did, redrow, barratts, morris and most of the other big developers would have a lot of tiles in skips..
Actually they do Diamond...Building Control have to sign off the second fixing and tiling is a second fix...
-
-
doug boardley
Guest
Re: Please give opinions on this tiling job
does the ceiling pitch slope down, if so, maybe the tiler hasn't put a back bevel on the tiles to take the face side up to the ceiling line
-
-
-
-
Re: Please give opinions on this tiling job
If you have time Clare, run a string line from one end of the ceiling/wall joint to the other, pull/fix it tight and see how it lies..do this for the top row of tiles as well and put a level on it to see if the rows tiles on either side of the door are level with each other..also put a level on the top of the door architrave..this will tell you what is/is not level and from that, you will know what needs fixing...
-
-
Re: Please give opinions on this tiling job
-
The Following User Says Thank You to diamondtiling For This Useful Post:
-
Re: Please give opinions on this tiling job
Must say that looks crap I wouldn't be pleased with that and any sites I have worked on would have had it fixed before tiling be it bad plastering or taping
-
-
New TilersForums Contributor
Re: Please give opinions on this tiling job
Ok, thanks, i'll arrange to go in and do that. I just want to make sure everything's ok before we exchange cos you can bet your bottom dollar it's a hell of a lot harder to get anything done once it's paid for!!
-
-
Re: Please give opinions on this tiling job
some would leave the top cut off and paint with the ceiling
-
-
Re: Please give opinions on this tiling job

Originally Posted by
diamondtiling
You might be right Diamond but I know on the garage conversion I've just finished, Building Control checked off all second fix fixings as per his pre-printed checksheet before signing the completion certificate..maybe different building control areas do different things...
-
The Following User Says Thank You to Daveyboy For This Useful Post:
diamondtiling (27-07-2009)
-
TilersForums Contributor
Re: Please give opinions on this tiling job
Hi, CL66!
As a matter of coincidence, in these days I'm working on exactly same job as you have - only instead of one bathroom, I have to tile five of them.
Perfect job, which you are looking into is actually much more difficult then it seems.
To achieve a 100% job, you'll need:
- death perfect level cealing, which is impossible
- death perfect level wall, which has to run death perfect parallel with your cealing, which is impossible too
or:
- very, very experienced tiler
Just b/c your cealing and your wall are definitely not perfect, tiler has only 2 choices:
1.) Finish the wall tiles in the same level - either the last tile is a full tile or if it's a cuting, then all cuts must be exatly the same.
In that case, tiler must mitre the top back edge of the tiles and finish these tiles in same line no matter what the cealing is wonky like.
In this case, you have also two choices - you'll either fill the gap between the tiles and cealing with painting filler (no grout!!!) and paint that filler with the same colour as the cealing, or, get a plasterer and make him replaster cealing - not a whole cealing, only the part of it - from edge of the tiles and loose it 2-3 feet from there
2.) if the cealing is not that bad, tiler has to cutt last line of the tiles following the line of the cealing, of course, he has to mitre the back top edge of the tiles again.
I only hope you understand me, what I wanted to say, IMHO you shoud get that gapp filled with filler and paint it or re-plaster that part of the cealing(this is the fastest and easiest way)
I'll get you some pics tommorow - how can it be done.
Last edited by milan11; 27-07-2009 at 08:14 PM.
-
-
New TilersForums Contributor
Re: Please give opinions on this tiling job
Thanks Milan, Pics would be good. You guys really know your stuff. If it weren't for this forum I'd never have realised that all tiles that join where walls join or at 90 degree angles need a sealant instead of grout so that it doesn't crack with the house movement etc, and this hasn't been done either, so need to mention that too.
-
The Following User Says Thank You to CL66 For This Useful Post:
-
Re: Please give opinions on this tiling job
The cause of the cuts increasing or decreasing in size often has noting to do with the ceiling or the tiling being out of level ,as millan says the wall has to be square to the ceiling to achieve a straight cutting line and has to be resonalbly level if the wall is out of square to a level angled ceiling it in effect makes the cuts icrease in size and therefore make the ceiling seem out of level solution i would say finish 2inches below the ceiling line and paint it in as previous tilers have suggested
-
-
New TilersForums Contributor
Re: Please give opinions on this tiling job
that's what i'd like, i don't even care if the tiles only come up to, say, the level of the door frame and it's all just painted above the same as the ceiling. Maybe the further from the ceiling the tiles end the less obvious it would look....
-
-
Re: Please give opinions on this tiling job

Originally Posted by
Daveyboy
You might be right Diamond but I know on the garage conversion I've just finished, Building Control checked off all second fix fixings as per his pre-printed checksheet before signing the completion certificate..maybe different building control areas do different things...
According to that programme that was on channel 4 a few weeks ago the building inspector needs to see and sign off everything if it is new build or major renovation. If it is just interior decorating I don't think the same rules apply. I do know that the BI inspects bulk house builders at second fix stage though.
-
The Following User Says Thank You to Ajax123 For This Useful Post:
-
Re: Please give opinions on this tiling job
thats a tasty one, had one last year that run out 45mm over 1 metre! new build of course. tiling was put in level line lowest level, skeiling was re-boarded somehow, big telling off for the tacker, haha
-
-
Re: Please give opinions on this tiling job
regardless of how the ceiling wall junction should or shouldnt be tiled its obvious from the first photo that the tiler has taken no care whotsoever just look at the tile cut above the door it doesn't line up with the tile on the right they need to strip the top row and redo and either keep the sam size cut straight across the ceiling line and paint out the gap to match the ceiling colour or bevel the top cut and fit it closer to the ceiling the second option in my opinion will only highlight the fact that you have an uneven ceiling line and the 1st opion only really works if the ceiling isnt to far out.
If you want it perfect then a ceiling line re skim is the only option
"WE DON'T PICK EM WE ONLY STICK EM"
-
-
New TilersForums Contributor
-
-
Re: Please give opinions on this tiling job
If you're happy with that Clare proposal, then it's a job done..if it was my new house, I'd get them to replaster the ceiling to give me a straight line but that's my personal choice..
Glad to hear solutions are being discussed/considered though and it sounds like a solution is not far away..keep communicating and I'm sure you'll soon own your dream home!
-
Similar Threads
-
By Dan in forum Tiling Courses Feedback
Replies: 0
Last Post: 02-04-2006, 10:49 PM
Visitors found this page by searching for:
tiling on ceiling slope
,
tilersforums.co.uk how big gap between wall and ceiling tile
,
tiling on sloped ceiling
Tags for this Thread
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules
Tilers Forums is the UK's largest wall and floor
tiling forum. Advice is provided free of charge to all users. Tilers Forums does not take responsibility for any loss or damage caused due to following advice found on this forum. All wall and floor tiling should be carried out by a qualified wall and floor tiler. Views expressed on this forum are of the users and not
Tilers Forums. Views expressed on this tiling forum are of the contributor only and not the forum as a whole. Not all views should be taken as fact but simply the opinion of the person posting. Readers are reminded to seek professional advice before undertaking any wall and floor tiling project.
Tilers Forums is a Trading Style of Untold Developments Ltd.
Search Engine Optimisation, Web Development and Online Marketing for the UK.
Bookmarks