Hi there all, Im new today so thanks for looking in. I have a job currently where the walls have been bonded over the brick work and the wall is very out of plumb. To plumb the wall it needs to brought out about 30mm at the top and areas of the wall needs to be filled about 30mm deep by 300mm round. Customer has 18mm x 300 x300mm marble tiles so where do I go from here? Do I heavy duty wire mesh deeps areas of the wall and wall plag and screw the mesh to the wall to hold whatever render I use. Been reading about weight restrictions and think I would be over it using a skim coat Please help, wot should I do?