Welcome to Tilers Forums Tiling Forum


The UK's Biggest Tiling Forum for DIY and Professional Tilers; find


  •  » Tile Advice for Bathroom Tiles, Kitchen Tiles, Wall Tiles, Floor Tiles
  •  » Customers can Find a Tiler, or Wall and Floor Tilers can Find Customers
  •  » Tiling Tools, Tile Adhesive, Tile Grout and other Tile Products
  •  » Advice and Discussion related to Tiling Courses and Tiling NVQ's
  •  » Professional Tilers can find Business Advice, Discounts, Trade Accounts

DIY and Professional Wall and Floor Tilers are Welcome


Advice from by Tilers, Manufacturers, Distributors and Tile Suppliers


REGISTER HERE FOR FREE


p.s.: Registered members will not see this ad

Results 1 to 13 of 13
Discuss Tiling on plasterboard in shower cubicle in the Tiling Forum at TilersForums; Hi, I've just registered on this forum as I need some advice and having read some of the threads already I'm sure I've come to the right place! I'm not ...
          
  1. #1
    New TilersForums Contributor PhiliousFog's Avatar
    Join Date
    Mar 2009
    Posts
    5
    Thanks
    1
    Thanked 0 Times in 0
    Posts

    Default Tiling on plasterboard in shower cubicle

    Hi,

    I've just registered on this forum as I need some advice and having read some of the threads already I'm sure I've come to the right place!

    I'm not a professional tiler but your everyday home DIY'r! I'm having to re-grout some of my tiles in my shower cubicle. I successfully removed the old grout around the 2 tiles which needed attention. I have also removed the silicon sealant along the bottom of these 2 tiles where they meet the shower tray. The sealant was going moldy despite saying on the tube anti mold!! Will not buy unibond sealant again! Have taken advice and now bought some Dow Corning 785. As a result of removing the surrounding old grout and the silicon the 2 tiles in question fell off!

    Behind the tiles over the top of the plasterboard was a kind of baking paper. Not sure what this is but it was pretty perished and flaked off in my hands. I removed this paper in the space where the 2 tiles were, reomoved all the old adhesive off the tiles, spread some new waterproof adhesive on the tiles and set back on the wall, making sure I plugged the gaps at the bottom with some small pieces of wood to stop the tiles dropping whilst setting.

    Well almost 24 hrs later the tiles havnt stuck and have fallen off again!!

    Having read a few threads this morning, it appears that I need to treat the plaster board with a primer, such as BAL SBR?

    If anyone can advise what I need to do to get my shower back to normal I'd be very grateful indeed!

    Cheers

    Phil

  2. #2
    New TilersForums Contributor PhiliousFog's Avatar
    Join Date
    Mar 2009
    Posts
    5
    Thanks
    1
    Thanked 0 Times in 0
    Posts

    Default Re: Tiling on plasterboard in shower cubicle

    Just to add, I'ts just clicked what the paper is, it's the top paper covering on the plasterboard! This has obviousley got damp as a result of the cracks in the old grout and the water getting through, all makes sense now!

    Will I be able to use a primer directly onto the plaster of the plasterboard?

    Cheers

    Phil

  3. #3
    Tilers Forums Arms Member rhyd4's Avatar
    Join Date
    Oct 2007
    Location
    blackwood-south wales
    Posts
    75
    Thanks
    2
    Thanked 25 Times in 16
    Posts

    Default Re: Tiling on plasterboard in shower cubicle

    it is best to cut the section out and replace with some fresh, although it can be achived with primer and powder adhesive, cheaper to board imho

  4. #4
    * TF Super Moderator *
    grumpygrouter's Avatar
    Join Date
    Apr 2007
    Location
    Portmahomack
    Posts
    8,184
    Thanks
    1,088
    Thanked 1,622 Times in 1,186
    Posts

    Default Re: Tiling on plasterboard in shower cubicle

    It seems to me you have got moisture ingress to your plasterboard substrate. it will be no good trying to just stick your tiles back on, it won't work. You really need to pull off the plasterboard and re-tile as your plasterboard has lost it's strength and is in danger of collapsing.

    You may get away with doing a repair job on the afffected area but you will need to pull off more tiles to see te extent of any damage. In all honesty, you are better off pulling it all down, reboarding and starting again. This time, either use a waterproof backer board to tile onto or normal plasterboard which had been "tanked" prior to tiling.

    Sorry to be the bearer of bad news.

    Oh! welcome to the forums.
    Grumpy
    tiling@grouters.co.uk

    Balancing Act Accounting
    Turnover is Vanity, Profit is Sanity, Cash is reality!

  5. #5
    TilersForums Trusted Member

    Alan.P's Avatar
    Join Date
    May 2007
    Location
    Stockton-on-Tees
    Posts
    2,979
    Thanks
    483
    Thanked 927 Times in 763
    Posts

    Default Re: Tiling on plasterboard in shower cubicle

    Yep, as Grumpy says, for safeties sake, at least take a few more rows off to check the condition of the board behind, chances are that the moister has risen up from the affected area causing weakness in the board

  6. #6
    tel 07790033332 pete f's Avatar
    Join Date
    Mar 2009
    Location
    bolton
    Posts
    255
    Thanks
    60
    Thanked 63 Times in 52
    Posts

    Default Re: Tiling on plasterboard in shower cubicle

    yes i would remove a few rows and check the board you can bet that it has perished did a job similar to this the other week damp had transfered itself into an adjoining room remove the board replace with backerboard re tile

  7. #7
    New TilersForums Contributor PhiliousFog's Avatar
    Join Date
    Mar 2009
    Posts
    5
    Thanks
    1
    Thanked 0 Times in 0
    Posts

    Default Re: Tiling on plasterboard in shower cubicle

    Thanks everyone for your messages and advice. I guess I was hoping for an easy solution and a quick fix but it doesnt seem that's going to be the case! Will take of a few more rows to see the extent of the damp and go from there. I was hpoing to dry out the affected area, prime with BAL SBR which I've just bought and replace the tiles, grout and seal but would this work??

    Any ideas on how much it should cost to get it repaired professionally and would the whole cubicle ( 3 sides need to be done) or just the affected side?

    Cheers

    Phil

  8. #8
    TilersForums Trusted Member

    Alan.P's Avatar
    Join Date
    May 2007
    Location
    Stockton-on-Tees
    Posts
    2,979
    Thanks
    483
    Thanked 927 Times in 763
    Posts

    Default Re: Tiling on plasterboard in shower cubicle

    Thing is with easy and quick fixes they normally create more work in the future, better to sort it right first time, sorry. Also, once plasterboard is damp it never dries to full strength, it's damaged, as for cost, if you post your postcode I'm sure someone off the forum will be in range to give advice and a quote.

    Hope that helps, at least a little

  9. #9
    New TilersForums Contributor PhiliousFog's Avatar
    Join Date
    Mar 2009
    Posts
    5
    Thanks
    1
    Thanked 0 Times in 0
    Posts

    Default Re: Tiling on plasterboard in shower cubicle

    Thanks Alan and sound advice. I've never been one to cut corners and do a job half hearted! I've never tiled before so not sure if this is a job I can do unassisted. Have a lot of friends in the trades and one is coming to have a look next week to advise so fingers crossed if it all needs to come down then we can do it together and perhaps I'll learn a thing or two!

    As long as the job's done properly, the cheaper the fix the better as was laid off work Friday so not good timing!

    Cheers

  10. #10
    Administrator


    Dave's Avatar
    Join Date
    May 2007
    Location
    County Durham
    Posts
    54,472
    Thanks
    9,718
    Thanked 14,141 Times in 9,988
    Posts
    Blog Entries
    1

    Default Re: Tiling on plasterboard in shower cubicle

    was laid off work Friday
    Sorry to hear that...

  11. The Following User Says Thank You to Dave For This Useful Post:

    PhiliousFog (08-03-2009)

  12. #11
    TilersForums Trusted Member

    Alan.P's Avatar
    Join Date
    May 2007
    Location
    Stockton-on-Tees
    Posts
    2,979
    Thanks
    483
    Thanked 927 Times in 763
    Posts

    Default Re: Tiling on plasterboard in shower cubicle

    Sorry to hear about your work situation, I hope that the damage is minimal and that you can get it fixed at a reasonable cost

    Let us know how you get on.

  13. #12
    Tilers Forums Arms Member
    mikethetile's Avatar
    Join Date
    Feb 2009
    Location
    leighton buzzard
    Posts
    6,240
    Thanks
    2,776
    Thanked 3,070 Times in 2,107
    Posts

    Default Re: Tiling on plasterboard in shower cubicle

    im with the others on this, bite the bullet and sort it properly first time rather than patching again and again and then end up ripping out and doing the job properly

    im sorry you were laid off
    I know nothing I havent learnt
    Painters and decorator Leighton Buzzard 01525 376559/07594 779654

  14. #13
    New TilersForums Contributor PhiliousFog's Avatar
    Join Date
    Mar 2009
    Posts
    5
    Thanks
    1
    Thanked 0 Times in 0
    Posts

    Default Re: Tiling on plasterboard in shower cubicle

    Thanks to you all for your good advice and kind comments.

    I'll come back to you later in the week and let you know how I got on!

    Cheers

    Phil

Similar Threads

  1. Tiling a Shower
    By Part-Time Tiler in forum Tiling Forum
    Replies: 1
    Last Post: 02-12-2008, 06:34 PM
  2. tiling a shower room
    By davesquash in forum Tile Adhesive, Grout and Substrate Preparation
    Replies: 4
    Last Post: 04-10-2008, 03:41 PM
  3. shower cubicle
    By dhsanta65 in forum Tiling Forum
    Replies: 8
    Last Post: 10-08-2008, 05:53 PM
  4. Shower Cubicle Walls
    By Jimmy Boy in forum Tiling Forum
    Replies: 5
    Last Post: 01-02-2008, 05:47 AM
  5. Tiling Courses & Tiling Course Companies
    By Dan in forum Tiling Courses Feedback
    Replies: 0
    Last Post: 02-04-2006, 10:49 PM

Visitors found this page by searching for:

how to waterproof plasterboard shower

waterproof plasterboard

tiling on plasterboard shower

cost of re tiling shower

cost of retiling shower cubicle

plasterboard shower enclosure

unibond and sand for shower enclosure

what to treat plasterboard with before tiling

cos to remove and replace shower cubicle

waterproof plasterboard for showers

plasterboard for showers

how to tile a shower cubicle

sbr waterproof before tiling

can u tile onto plasterboard behind shower

remove shower cubicle tiles

should i unibond plasterboard before tiling

sbr waterproof plasterboard

remove shower tiles plasterboard

how to tile a shower enclosure youtube

plasterboard shower back

could i sbr a plasterboard to waterproof it

unibond on plasterboard

plasterboard a shower enclosure

platerboartd for shower rooms

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Tilers Forums is the UK's largest wall and floor tiling forum. Advice is provided free of charge to all users. Tilers Forums does not take responsibility for any loss or damage caused due to following advice found on this forum. All wall and floor tiling should be carried out by a qualified wall and floor tiler. Views expressed on this forum are of the users and not Tilers Forums. Views expressed on this tiling forum are of the contributor only and not the forum as a whole. Not all views should be taken as fact but simply the opinion of the person posting. Readers are reminded to seek professional advice before undertaking any wall and floor tiling project.

Tilers Forums is a Trading Style of Untold Developments Ltd. Search Engine Optimisation, Web Development and Online Marketing for the UK.
DMCA.com
[Output: 121.64 Kb. compressed to 109.09 Kb. by saving 12.55 Kb. (10.32%)]

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28