Results 1 to 4 of 4
What will happen next
Discuss What will happen next in the Tiling Forum at Tilers Forum; Based in Southern Spain.Customer of mine wanted small back garden levelled and then tiled over, about 10 sq metres. Seen the work this morning and the builder has levelled and ...- 06-02-2009 #1New Tiling Forum Contributor
- Join Date
- Aug 2008
- Posts
- 12
- Thanks
- 6
- Thanked 1 Time in 1 Post
What will happen next
Based in Southern Spain.Customer of mine wanted small back garden levelled and then tiled over, about 10 sq metres.
Seen the work this morning and the builder has levelled and put down a screed base about 2 to 3 inches thick.
He has tiled on top after a day and I am concerned if this is what should have happened.
As there is no specialist adhesives over here what is likely to happen next.
- 06-02-2009 #2LeatherfaceGuest
Re: What will happen next
I think may very likely to lift !!
- 06-02-2009 #3Tilers Forums Arms Member

- Join Date
- Apr 2008
- Location
- London UK
- Posts
- 264
- Thanks
- 22
- Thanked 74 Times in 55
Posts
Re: What will happen next
screed or concrete base? If just screed to earth it wont last long.
mind you it depends on how good its meant to be; less extrememes of weather and low footfall plus fairly sound soil / stone substrate it might be ok for a while - there is plenty of cheapo work done there too.
Re adhesives, you will find the adhesives supplied there from tile specialists same as here. Bit more spread geographicaly perhaps.
- 06-02-2009 #4LeatherfaceGuest
Re: What will happen next
Many adhesives are sold worldwide, Mapei website has a listing for Mapei Spain
Similar Threads
-
What would Happen
By abskiing in forum Tiling ForumReplies: 20Last Post: 09-12-2007, 06:17 PM


LinkBack URL
About LinkBacks

Reply With Quote













Anyone working the weekend ?
44 Minutes Ago in Tiling Forum