| Notices | Unregistered; We can see that you haven't yet posted anything. Please consider posting an informal introduction message in the 'New Members Say Hi Here' forum category. If you're not registered then please feel free to sign-up, it's FREE, and we don't bite!
---------- Checkout the Tile Business Network. It's FREE to join and can help put you in touch with the right people at the right time! Suppliers, Distributors, Manufacturers, Training Establishments and Tile Contractors ALL WELCOME. www.tilerstilingtiles.co.uk
---------- We've updated two of our external website's. Pro Tiling Tools and Tiling Courses Companies. Please check those out when you have a moment free.
---------- Please consider chatting live to other forum members in our Live Tile Chatrooms. From 8pm nightly every day of the week. The chatroom IS open 24/7 though.
---------- | Tiling Forum Discussions on all aspects of tiling & installing tiles in the tiling forum. |
10-04-2007
|
#1 | | TilersForums Trusted Member
Join Date: Mar 2007 Location: County Durham
Posts: 2,540
Thanks: 22
Thanked 65 Times in 56 Posts
| Prepping concrete floors | | Was talking to a local tiler the other day and he was telling me he had just finished plying a concrete floor ready to tile. This seemed strange to me as if a concrete floor ever needed levelling i always use self levelling compound, he thought i was strange, said he always ply's concrete floors, drills the concrete, plugs the holes and screws the boards. Must take him a while. Any of you guys ever ply'd a concrete floor and if so why? | | |
| |
10-04-2007
|
#2 | | TilersForums Contributor
Join Date: Feb 2007
Posts: 69
Thanks: 0
Thanked 0 Times in 0 Posts
| Re: Prepping concrete floors | | If the entire floor was concrete then yes, thats mental. I did have a quote a few weeks ago where the floor ran into an ext. and I had about 18mtr or boards and then ran onto concrete for about 6mtr. Options would have been, plyout then self level, hardibacker board the lot or ply the lot. Must admit plying the lot seemed an easy option to get the job preped quickly. Plying concrete seems alot of work and totally against the object of what your trying to create inthe first place.
IMO | | |
| |
10-04-2007
|
#3 | | Tiling Courses Staff
Join Date: Dec 2006 Location: North East
Posts: 449
Thanks: 10
Thanked 49 Times in 35 Posts
| Re: Prepping concrete floors | | No need to ply concrete, just seal and tile, if self leveling, seal floor, level it, seal again, tile it,
Guy might be cashing in on uneccessary work | |
| |
10-04-2007
|
#4 | | TilersForums Trusted Member
Join Date: Mar 2007 Location: County Durham
Posts: 2,540
Thanks: 22
Thanked 65 Times in 56 Posts
| Re: Prepping concrete floors | | I agree guys, seemed really strange to me, just wanted to make sure my sanity in tact  | | |
| |
11-04-2007
|
#5 | | Guest | Re: Prepping concrete floors | | Quote:
Originally Posted by Varley Was talking to a local tiler the other day and he was telling me he had just finished plying a concrete floor ready to tile. This seemed strange to me as if a concrete floor ever needed levelling i always use self levelling compound, he thought i was strange, said he always ply's concrete floors, drills the concrete, plugs the holes and screws the boards. Must take him a while. Any of you guys ever ply'd a concrete floor and if so why? | Yes, to raise a floor level with an adjoining floor, that was uneven to start with. It was over a massive area, so it was quicker and cheaper to board it as opposed to SLC. Perfect surface too. | | |
| |
11-04-2007
|
#6 | | Mr PAT (Pro Active Tiler)
Join Date: Feb 2007 Location: Halifax
Posts: 890
Thanks: 0
Thanked 10 Times in 7 Posts
| Re: Prepping concrete floors | | Have seen it done - but have never done myself. Always self level if needed. The labour cost for plying, in my opinion is greater than labour cost to self level -the 2 nearly balance themselves out. The self levelled surface in my opinion is better than a plywood surface | | |
| |
11-04-2007
|
#7 | | Tilers Forums Admin
Join Date: Apr 2006 Location: Staffordshire, UK
Posts: 5,789
Thanks: 509
Thanked 580 Times in 217 Posts
| Re: Prepping concrete floors | | If it's too big to level at a decent cost you would screed it I think wouldn't you? You can add chippings to SLC to thicken it out and allow it to withstand a thicker bed with some brands I think. | Dan  |
| |
11-04-2007
|
#9 | | Guest | Re: Prepping concrete floors | | Quote:
Originally Posted by Leatherface Have seen it done - but have never done myself. Always self level if needed. The labour cost for plying, in my opinion is greater than labour cost to self level -the 2 nearly balance themselves out. The self levelled surface in my opinion is better than a plywood surface | The guy wanted ply, so thats what he got and paid for it  | | |
| |
11-04-2007
|
#11 | | Guest | Re: Prepping concrete floors | | He wanted it raised by 15-20mil (I cant remember - it was ages ago) to meet the level of an adjoing floor, allowing for 15mil for tiles and adhesive. | | |
| |
11-04-2007
|
#12 | | Mr PAT (Pro Active Tiler)
Join Date: Feb 2007 Location: Halifax
Posts: 890
Thanks: 0
Thanked 10 Times in 7 Posts
| Re: Prepping concrete floors | | Sorry Concept - I wasn't implying that you were wrong.
The self leveller I use can be applied up to 30mm in one application and is guaranteed not to shrink or crack. My powers of persuasion usually work with the customer.
Anyone that chooses to ply over concrete - fine by me  | | |