Welcome to Tilers Forums Tiling Forum


The UK's Biggest Tiling Forum for DIY and Professional Tilers; find


  •  » Tile Advice for Bathroom Tiles, Kitchen Tiles, Wall Tiles, Floor Tiles
  •  » Customers can Find a Tiler, or Wall and Floor Tilers can Find Customers
  •  » Tiling Tools, Tile Adhesive, Tile Grout and other Tile Products
  •  » Advice and Discussion related to Tiling Courses and Tiling NVQ's
  •  » Professional Tilers can find Business Advice, Discounts, Trade Accounts

DIY and Professional Wall and Floor Tilers are Welcome


Advice from by Tilers, Manufacturers, Distributors and Tile Suppliers


REGISTER HERE FOR FREE


p.s.: Registered members will not see this ad

Results 1 to 16 of 16
Discuss floor tiling soon after screeding......... in the Tile Adhesive, Grout and Substrate Preparation at TilersForums; Friend is building his own house, concrete floors, yet to have wet ufh and 50mm screed. To avoid waiting the 'day per mm' to lay floor tiles, is it simply ...
          
  1. #1
    Tilers Forums Arms Member aflemi's Avatar
    Join Date
    Apr 2008
    Posts
    333
    Thanks
    171
    Thanked 40 Times in 31
    Posts

    Default floor tiling soon after screeding.........

    Friend is building his own house, concrete floors, yet to have wet ufh and 50mm screed.
    To avoid waiting the 'day per mm' to lay floor tiles, is it simply a matter of a de-coupling membrane?
    Also, the ufh will be incorporated in the c/h circuit so impossible to control the temp as you would with a heating mat. What can be done to prevent the adhesive failing.

  2. #2
    Administrator


    Dave's Avatar
    Join Date
    May 2007
    Location
    County Durham
    Posts
    54,465
    Thanks
    9,718
    Thanked 14,141 Times in 9,988
    Posts
    Blog Entries
    1

    Default Re: floor tiling soon after screeding.........

    They need to commission the inscreed heating before tiling..

  3. The Following User Says Thank You to Dave For This Useful Post:

    aflemi (23-11-2010)

  4. #3
    Tilers Forums Arms Member aflemi's Avatar
    Join Date
    Apr 2008
    Posts
    333
    Thanks
    171
    Thanked 40 Times in 31
    Posts

    Default Re: floor tiling soon after screeding.........

    sorry Dave, you'll have to expand for me? Is there a time formula?

  5. #4
    Tool Hound


    Sir Ramic's Avatar
    Join Date
    Jan 2008
    Location
    Stourbridge, West Midlands
    Posts
    16,532
    Thanks
    1,471
    Thanked 5,604 Times in 3,566
    Posts
    Blog Entries
    2

    Default Re: floor tiling soon after screeding.........

    Quote Originally Posted by aflemi View Post
    sorry Dave, you'll have to expand for me? Is there a time formula?
    It means the heating system needs to be brought up to working/max temp and then down before any tiling takes place.
    Wall and floor tiler in the West Midlands, Dudley, Stourbridge. www.nptiling.co.uk

  6. The Following User Says Thank You to Sir Ramic For This Useful Post:

    aflemi (23-11-2010)

  7. #5
    Tilers Forums Pro - Screed Advisor
    Ajax123's Avatar
    Join Date
    Apr 2009
    Location
    Lincolnshire
    Posts
    3,014
    Thanks
    329
    Thanked 1,513 Times in 926
    Posts
    Blog Entries
    1

    Default Re: floor tiling soon after screeding.........

    The under floor heating MUST MUST MUST be comissioned and run before tiling. This is irrelevent to drying although has the effect of drying the screed. What type of screed are you using? I assume when you say it is connected into the central heating system you are using a return temeprature limting valve. This would allow you at least some control over the temperature. As you have limited control I would recomend uncoupling anyway. But you must run the heating through the screed before you install any type of floor primer or covering.
    you must all buy this song from any good download site for just 79p. Proceeds to Blesma, RAFA and RAFBF charities



    Teresa Hind - The Fight Goes On

  8. The Following User Says Thank You to Ajax123 For This Useful Post:

    aflemi (23-11-2010)

  9. #6
    Administrator


    Dave's Avatar
    Join Date
    May 2007
    Location
    County Durham
    Posts
    54,465
    Thanks
    9,718
    Thanked 14,141 Times in 9,988
    Posts
    Blog Entries
    1

    Default Re: floor tiling soon after screeding.........

    Off the top of my head it is around 20 odd days before turning on the UFH..( Alan above will state the correct length of time) this allows the screed to shrink and curl , then you can use a vapour equalisation membrane to allow the floor to continue drying..and this will help with eliminating any stress on the tiled finish.

    If no heating was being used then you can tile on it a lot quicker with the same membrane.. dural Ci is one i use..

  10. #7
    Tilers Forums Arms Member aflemi's Avatar
    Join Date
    Apr 2008
    Posts
    333
    Thanks
    171
    Thanked 40 Times in 31
    Posts

    Default Re: floor tiling soon after screeding.........

    ok so the screed manufacturer will advise on time before turning on heating and commissioning strategy. Then when it has been fully commissioned, I lay a vapour equalisation membrane (dural CI?) and tile. Bearing in mind the limited temp control, we do as much as possible to gradually increase the temp to max and reduce back down as you would with a mat?
    As background, the house is extremely well insulated, he is using various state of the art heat exchangers, thermal and solar heat sources etc, and reckons the house will require very little actual heating so the max temp will not be that high. Have I got it right?
    Last edited by aflemi; 23-11-2010 at 09:45 PM. Reason: clarity

  11. #8
    Tilers Forums Pro - Screed Advisor
    Ajax123's Avatar
    Join Date
    Apr 2009
    Location
    Lincolnshire
    Posts
    3,014
    Thanks
    329
    Thanked 1,513 Times in 926
    Posts
    Blog Entries
    1

    Default Re: floor tiling soon after screeding.........

    the only thing you havenet confirmed is the screed type. Bear in mind the required depths to meet british standards etc for warranty purposes. Other than that your last post is pretty much it.
    you must all buy this song from any good download site for just 79p. Proceeds to Blesma, RAFA and RAFBF charities



    Teresa Hind - The Fight Goes On

  12. #9
    Tilers Forums Arms Member aflemi's Avatar
    Join Date
    Apr 2008
    Posts
    333
    Thanks
    171
    Thanked 40 Times in 31
    Posts

    Default Re: floor tiling soon after screeding.........

    Quote Originally Posted by Ajax123 View Post
    the only thing you havenet confirmed is the screed type. Bear in mind the required depths to meet british standards etc for warranty purposes. Other than that your last post is pretty much it.
    Thanks Ajax, I don't know the screed type, but will find out and would appreciate your expert input. Cheers.

  13. #10
    Tilers Forums Arms Member aflemi's Avatar
    Join Date
    Apr 2008
    Posts
    333
    Thanks
    171
    Thanked 40 Times in 31
    Posts

    Default Re: floor tiling soon after screeding.........

    Quote Originally Posted by Ajax123 View Post
    the only thing you havenet confirmed is the screed type. Bear in mind the required depths to meet british standards etc for warranty purposes. Other than that your last post is pretty much it.
    Now he has decided on heating mats. Screed is anhydrite 40mm apparently ready to tile on in 3 days? Is that right and would the heating mat above make a difference? Apart from priming the screed would you have any other prep before laying the mat?

  14. #11
    Administrator


    Dave's Avatar
    Join Date
    May 2007
    Location
    County Durham
    Posts
    54,465
    Thanks
    9,718
    Thanked 14,141 Times in 9,988
    Posts
    Blog Entries
    1

    Default Re: floor tiling soon after screeding.........

    Which make of Anhydrite is it..?

  15. #12
    Tilers Forums Pro - Screed Advisor
    Ajax123's Avatar
    Join Date
    Apr 2009
    Location
    Lincolnshire
    Posts
    3,014
    Thanks
    329
    Thanked 1,513 Times in 926
    Posts
    Blog Entries
    1

    Default Re: floor tiling soon after screeding.........

    Quote Originally Posted by aflemi View Post
    Now he has decided on heating mats. Screed is anhydrite 40mm apparently ready to tile on in 3 days? Is that right and would the heating mat above make a difference? Apart from priming the screed would you have any other prep before laying the mat?

    ready to tile on in three days - I don't think so!! Would love to know who has passed this gem on. The depth is fine. I assume now that there is no heating within the screed hence the use of heat mats instead. The standard drying rate in good conditions for anhydrite is 1mm per day up to 40mm depth so you are looking at 40 days. You can accelerate this by force drying the screed from 7 days old. Without underfloor heating this is acheivable by using space heaters and dehumidifiers or a specialist drying technique which would speed it up a little further. This will probably somewhere near half the drying time but this is variable based on site conditions. The weather at present is far from good for drying screeds so I would suggest force drying is the best option anyway.

    It depends on the screed supplier as to the level of prep required. If it is an old fashioned supplier it will have a soft friable skin on it which will need to be removed by either sanding or gentle shotblasting and the residual dust vacuuming. This is essential as the skin is not part of the screed. If it is a more modern supplier it will not have said skin. Then it depends on how old it is as it will be trafficked by site and willl this time of year be dirty. The easiest way to clean this up would be to sand it but in this case you are not looking to "remove" anything other than the site dirt. Again it will need to be vacuumed and then it is ready for priming.

    My suggestion if you intend to use a heat mat with levelling compound I would suggest one based on gypsum as this is fully compatible with the screed. The primer will then be a standard acrylic primer. You can then use a gypsum based tile adhesive to stick down the tiles in the normal way.
    you must all buy this song from any good download site for just 79p. Proceeds to Blesma, RAFA and RAFBF charities



    Teresa Hind - The Fight Goes On

  16. #13
    Tilers Forums Arms Member aflemi's Avatar
    Join Date
    Apr 2008
    Posts
    333
    Thanks
    171
    Thanked 40 Times in 31
    Posts

    Default Re: floor tiling soon after screeding.........

    Ok thanks, Ajax all understood and I remember you posting about Gypsum-compatible adhesive so will get one from that list.
    Re drying time, I will check with manufacturer but also, would Dural CI make a difference in waiting time?

  17. #14
    Tilers Forums Arms Member aflemi's Avatar
    Join Date
    Apr 2008
    Posts
    333
    Thanks
    171
    Thanked 40 Times in 31
    Posts

    Default Re: floor tiling soon after screeding.........

    Ajax, He tells me now its Gyvlon 40 mm anhydrite screed, which you obviously will know all about. So we can force dry it if required. Assume we would need a moisture measuring device to check when it's ready, any advice on that?
    You mention using a gypsum-compatible adhesive, Mapei say that Latexplan can be used over anhydrite screeds if primed http://www.mapei.com/public/GB/products/506_GB.pdf
    Is there any reason why that would not work in this situation?
    Help much appreciated........

  18. #15
    Tilers Forums Pro - Screed Advisor
    Ajax123's Avatar
    Join Date
    Apr 2009
    Location
    Lincolnshire
    Posts
    3,014
    Thanks
    329
    Thanked 1,513 Times in 926
    Posts
    Blog Entries
    1

    Default Re: floor tiling soon after screeding.........

    In perfect conditions with perfect preparation it is perfectly reasonable to use an acrylic primer and cement based adhesive over an anhydrite screed. However I am not convinced that you are dealing with the perfect site here. I will let Mapei stand or fall by their on advice in respect of ther own materials. You have undoubtedly read other posts on adhesive types and the reasons for choosing different types with different screeds. For me it is all about building in robustness in order to protect you and your client in the long term from problems. I can say that I am unaware of any issues where a gypsum adhsive has been used. If you go the cement way you must make sure that the screed is below 75% relative humidity measured with a hair hygrometer. You would need to ensure a high end acrylic primer is used or better still use a water dispersible epoxy primer.

    You are right that the material can be force dried. - as it is 40mm I assume he has decided not to go for wet underfloor heating so force drying would involve space heating and dehumidifiers. I say this because generally 40mm is not deep enouh over a standard domestic wet system - needs to be 30mm cover to pipes so 15mm pipe plus 30mm cover is 45mm total minimum depth - I would usually specify 50mm nominal in this situation.
    you must all buy this song from any good download site for just 79p. Proceeds to Blesma, RAFA and RAFBF charities



    Teresa Hind - The Fight Goes On

  19. The Following User Says Thank You to Ajax123 For This Useful Post:

    aflemi (08-12-2010)

  20. #16
    Administrator


    Dave's Avatar
    Join Date
    May 2007
    Location
    County Durham
    Posts
    54,465
    Thanks
    9,718
    Thanked 14,141 Times in 9,988
    Posts
    Blog Entries
    1

    Default Re: floor tiling soon after screeding.........

    Quote Originally Posted by Ajax123 View Post
    In perfect conditions with perfect preparation it is perfectly reasonable to use an acrylic primer and cement based adhesive over an anhydrite screed. However I am not convinced that you are dealing with the perfect site here. I will let Mapei stand or fall by their on advice in respect of ther own materials. You have undoubtedly read other posts on adhesive types and the reasons for choosing different types with different screeds. For me it is all about building in robustness in order to protect you and your client in the long term from problems. I can say that I am unaware of any issues where a gypsum adhsive has been used. If you go the cement way you must make sure that the screed is below 75% relative humidity measured with a hair hygrometer. You would need to ensure a high end acrylic primer is used or better still use a water dispersible epoxy primer.

    You are right that the material can be force dried. - as it is 40mm I assume he has decided not to go for wet underfloor heating so force drying would involve space heating and dehumidifiers. I say this because generally 40mm is not deep enouh over a standard domestic wet system - needs to be 30mm cover to pipes so 15mm pipe plus 30mm cover is 45mm total minimum depth - I would usually specify 50mm nominal in this situation.

    Perfect answer from a perfect member..

  21. The Following User Says Thank You to Dave For This Useful Post:

    Ajax123 (08-12-2010)

Similar Threads

  1. Recommendation: Laser level floor screeding
    By Glasnevintiling in forum Tiling Forum
    Replies: 11
    Last Post: 26-09-2010, 01:14 PM
  2. tiling and screeding floors
    By thfc191 in forum Tiling Forum
    Replies: 19
    Last Post: 16-02-2010, 07:15 PM
  3. Replies: 3
    Last Post: 18-03-2008, 02:55 PM
  4. Screeding a floor!!
    By Jeffinoz in forum Tiling Forum
    Replies: 6
    Last Post: 05-09-2007, 07:33 PM

Visitors found this page by searching for:

tiling after screeding

screeding how long

how long after screeding can i lay floors

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Tilers Forums is the UK's largest wall and floor tiling forum. Advice is provided free of charge to all users. Tilers Forums does not take responsibility for any loss or damage caused due to following advice found on this forum. All wall and floor tiling should be carried out by a qualified wall and floor tiler. Views expressed on this forum are of the users and not Tilers Forums. Views expressed on this tiling forum are of the contributor only and not the forum as a whole. Not all views should be taken as fact but simply the opinion of the person posting. Readers are reminded to seek professional advice before undertaking any wall and floor tiling project.

Tilers Forums is a Trading Style of Untold Developments Ltd. Search Engine Optimisation, Web Development and Online Marketing for the UK.
DMCA.com
[Output: 152.93 Kb. compressed to 137.70 Kb. by saving 15.24 Kb. (9.96%)]

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28