Welcome to Tilers Forums Tiling Forum


The UK's Biggest Tiling Forum for DIY and Professional Tilers; find


  •  » Tile Advice for Bathroom Tiles, Kitchen Tiles, Wall Tiles, Floor Tiles
  •  » Customers can Find a Tiler, or Wall and Floor Tilers can Find Customers
  •  » Tiling Tools, Tile Adhesive, Tile Grout and other Tile Products
  •  » Advice and Discussion related to Tiling Courses and Tiling NVQ's
  •  » Professional Tilers can find Business Advice, Discounts, Trade Accounts

DIY and Professional Wall and Floor Tilers are Welcome


Advice from by Tilers, Manufacturers, Distributors and Tile Suppliers


REGISTER HERE FOR FREE


p.s.: Registered members will not see this ad

Results 1 to 5 of 5
Discuss Speed up screed drying time! in the Tile Adhesive, Grout and Substrate Preparation at TilersForums; Received this email the other day : Introducing Flexi Dry Floor Screeds FlexiDry - a floor screed additive that dramatically reduces drying times. Why wait 110 days for your floor ...
          
  1. #1
    Tilers Forums Arms Member

    CCTiling's Avatar
    Join Date
    Aug 2008
    Location
    East Sussex
    Posts
    734
    Thanks
    276
    Thanked 316 Times in 197
    Posts

    Default Speed up screed drying time!

    Received this email the other day :


    Introducing FlexiDry Floor Screeds

    FlexiDry - a floor screed additive that dramatically reduces drying times. Why wait 110 days for your floor screed to dry when you can choose 3, 7, 14 or 21 days?
    Used successfully in thousands of projects throughout Europe, FlexiDry is a low concentrated liquid additive that is simply added to a cementitious screed mix on site. Depending on the concentration added, FlexiDry transforms screed drying times with a choice of 3, 7, 14 or 21 days.
    In addition to reduced drying times, FlexiDry benefits include the ability to accept foot traffic after 12 hours of laying; improved compressive strength; and a reduced carbon footprint. Due to its high density and easy compaction FlexiDry is the perfect partner for underfloor heating systems.















    As a company, FlexiDry Global Ltd is committed to ensuring construction professionals in the UK are well placed to take full advantage of this significant advance in screed technology. A quality assured product, a growing portfolio of certified contractors and full technical support are among the ways we are making FlexiDry easy to specify and use. Further information on FlexiDry Floor Screeds can be obtained direct from NBS using their RIBA Product Selector.

    Find out more about how FlexiDry can keep your project on programme at minimal cost, visit www.flexidry.com now for comprehensive details on the product that is transforming site procedures in the UK and speeding up build times. View our new Installation and FAQ Videos in our Expert Centre
    Specify FlexiDry for your next project with complete assurance.
    I feel the need, the need for speed!

    www.cedarceramicstiling.co.uk

  2. #2
    kkoll
    Guest kkoll's Avatar

    Default Re: Speed up screed drying time!

    Are these drying times meant to be quick? With Keracem Eco hydraulic screed binder from Kerakoll you can foot traffic after 8 hours, lay ceramic tiles after 24 hours and hardwood floors after 5 days!

  3. #3
    Tilers Forums Arms Member

    CCTiling's Avatar
    Join Date
    Aug 2008
    Location
    East Sussex
    Posts
    734
    Thanks
    276
    Thanked 316 Times in 197
    Posts

    Default Re: Speed up screed drying time!

    Quote Originally Posted by kkoll View Post
    Are these drying times meant to be quick? With Keracem Eco hydraulic screed binder from Kerakoll you can foot traffic after 8 hours, lay ceramic tiles after 24 hours and hardwood floors after 5 days!
    Wow that is quick. Don't know much about screeds, just thought I would share email with forum!
    I feel the need, the need for speed!

    www.cedarceramicstiling.co.uk

  4. #4
    Tilers Forums Pro - Screed Advisor
    Ajax123's Avatar
    Join Date
    Apr 2009
    Location
    Lincolnshire
    Posts
    3,014
    Thanks
    329
    Thanked 1,513 Times in 926
    Posts
    Blog Entries
    1

    Default Re: Speed up screed drying time!

    As with all screeds the issue is that the screed drying time is only fast if the screed is kept dry. I can understand the benefit of laying a screed and then being able to tile on it after 7 days or what ever the time scale is but this is only useful if the tiles are actually laid after that time. In most contracts the screed is laid weeks if not months before the tiles and so have time not only to dry but also to get wet again. There are a whole rake of fast drying screeds available - this appears to be the latest to jump on that particular wagon.
    you must all buy this song from any good download site for just 79p. Proceeds to Blesma, RAFA and RAFBF charities



    Teresa Hind - The Fight Goes On

  5. The Following User Says Thank You to Ajax123 For This Useful Post:

    CCTiling (24-09-2010)

  6. #5
    Tilers Forums Arms Member
    Diamond Pool Finishers's Avatar
    Join Date
    Feb 2009
    Location
    we work nationwide .
    Posts
    6,843
    Thanks
    97
    Thanked 83 Times in 65
    Posts

    Default Re: Speed up screed drying time!

    yes but what is the curing time, the water can dry out quit quickly ??

Similar Threads

  1. Floor screed drying time - advice please
    By mick7 in forum Tiling Forum
    Replies: 45
    Last Post: 19-07-2010, 09:12 PM
  2. drying times on new screed
    By andy allen in forum Tiling Forum
    Replies: 10
    Last Post: 05-07-2010, 08:37 PM
  3. Concrete screed drying times
    By Scott in forum Tiling Forum
    Replies: 11
    Last Post: 26-04-2010, 08:11 PM
  4. drying out fresh screed...
    By Grace'sDad in forum Tiling Forum
    Replies: 12
    Last Post: 15-05-2008, 04:48 PM
  5. Screed drying times.
    By CJ in forum Tiling Forum
    Replies: 3
    Last Post: 29-07-2007, 09:57 PM

Visitors found this page by searching for:

floor screed drying time

how important is it to wait 48 hours with liquid screed

drying times floor screed

keracem eco

speed up screed drying out

floor screed drying times

Screed curing times

speeding up screed drying time

cement additives to speed up curing time

drying floor screed

speed up screed drying time

how to speed up tile adhesive dry time

drying out screed

fast curing cement binder for liquid screeds

floor screed additives

how dry screed

keracem suppliers

tips to dry out screed floors

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Tilers Forums is the UK's largest wall and floor tiling forum. Advice is provided free of charge to all users. Tilers Forums does not take responsibility for any loss or damage caused due to following advice found on this forum. All wall and floor tiling should be carried out by a qualified wall and floor tiler. Views expressed on this forum are of the users and not Tilers Forums. Views expressed on this tiling forum are of the contributor only and not the forum as a whole. Not all views should be taken as fact but simply the opinion of the person posting. Readers are reminded to seek professional advice before undertaking any wall and floor tiling project.

Tilers Forums is a Trading Style of Untold Developments Ltd. Search Engine Optimisation, Web Development and Online Marketing for the UK.
DMCA.com
[Output: 81.37 Kb. compressed to 74.86 Kb. by saving 6.50 Kb. (7.99%)]

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28