hiya lads ,how long should this be left before tiling on ,and will it need a primer,i think not but welcome advice
its in a conservatory,dont know the thickness,cheers steve
Welcome to Tilers Forums Tiling Forum
The UK's Biggest Tiling Forum for DIY and Professional Tilers; find
DIY and Professional Wall and Floor Tilers are Welcome
Advice from by Tilers, Manufacturers, Distributors and Tile Suppliers
p.s.: Registered members will not see this ad
hiya lads ,how long should this be left before tiling on ,and will it need a primer,i think not but welcome advice
its in a conservatory,dont know the thickness,cheers steve
Last edited by stevee; 06-06-2010 at 08:28 AM.


would help if you knew thickness,drying time approx 1-2mm per day , depending on temp

Does anyone know the origin of the advice that you follow in the UK regarding drying time for screeds?
I'm curious to learn why we have such different standards in the US and Canada. For a thick mudbed on a floor, say 2 inches/50 mm, I would wait maybe 2 days before setting tile or installing a sheet membrane. I would wait longer for mud on the wall because it has more moisture in it, but likely not more than 3-4 days.
Most of the shrinkage is done in the first day or so.
Phil, you've done a lot of mud work in the US...how are things done differently here such that we have such different standards for curing of the mudbeds?

BRITISH STANDARD'S are the most popular rob we refer to them as BS, not bull ****![]()
WEB http://www.diamondpoolfinishers.co.uk/ YOU TUBE http://www.youtube.com/user/MrGooner59 POOL TILE ADVICE http://www.scribd.com/doc/73214640/A...WIMMING-POOL’S
Rob Z (06-06-2010)

Dave, what is done so differently I wonder? Is portland made differently in the UK? Are the mixes a lot wetter? More conservative approach on the curing times?
For guys that are doing mud floors and walls in baths and kitchens...are they really waiting 2-3 weeks before setting tile?

yes they are if they are going by the book, but if not then they are tileing and so forth just a few day,s after, but all the addy makers have get-out holes if you do not go by the book mate
WEB http://www.diamondpoolfinishers.co.uk/ YOU TUBE http://www.youtube.com/user/MrGooner59 POOL TILE ADVICE http://www.scribd.com/doc/73214640/A...WIMMING-POOL’S



philhobsontiler@live.co.uk
07711 310 960
Measure twice cut once
www.philhobsontiler.co.uk
http://www.youtube.com/watch?v=y0i8NYD-QgE
http://www.youtube.com/watch?v=sg7qjC_C8AM

WEB http://www.diamondpoolfinishers.co.uk/ YOU TUBE http://www.youtube.com/user/MrGooner59 POOL TILE ADVICE http://www.scribd.com/doc/73214640/A...WIMMING-POOL’S
Phil Hobson (06-06-2010)
so shall i go for a month?



I would be confident at that, but best to stick to BS imo![]()
philhobsontiler@live.co.uk
07711 310 960
Measure twice cut once
www.philhobsontiler.co.uk
http://www.youtube.com/watch?v=y0i8NYD-QgE
http://www.youtube.com/watch?v=sg7qjC_C8AM
stevee (06-06-2010)
BS is 3 weeks minimum for cement:sand screeds. After this time moisture content is irrelevant for tiling. It is if you are applying a resin, resilient or wood floor finish.

Hi Dock, very interesting....do you know if thinsets are formulated that much differently in Europe and North America? Is the concern of the BS only because of shrinkage in the mud bed, or is it also because of some interaction of latent moisture with the setting materials?
Rob
The information within the BS is related mainly to the initial drying shrinkage associated with concrete formulations used. This information has been collated from various bodies since BS's for tiling were made available. They started out as MOD standards years ago but have been amended and honed over the years using data specific to sites within the UK.
Last edited by dock; 07-06-2010 at 01:11 PM. Reason: spelling error

Dock,
I know this is unrelated to the topic of BS, but Schluter here in the US and Canada have a different approach to specified thinsets and their membranes as compared to those specs in the European market (I'm sure you are familiar with the modified/non modified debate here in the US). When pressed for an answer as to why Schluter has an approach in Europe that is 180 degrees out from the approach here in N America, all we can get is a nebulous "thinsets are formulated differently in Europe".