M
MTiler
i assume you do plastering too for creating the substrate?
All the steam rooms, ice fountains etc. I do are constructed from pre-formed Wedi and as most are commercial jobs all the main prep is pre-done. I usually just need to scrim any uneven joints etc with the white addy or use thin wedi board to level something off or bring a ledge etc up to the right height for the mosaics, or build up a curve to a suitable radius.