Bar refit
L

- Bar refit

  • LM
L
LEE MAC The works carried out here involved 300 metres of 600 x 600 x 10mm porcelain. The substrate was of mixed materials in a building that had been added to and changed many times over the years so there was no uniformity to the areas of different substrates. The job was specified by Botament and involved their D11 and D15 primers, M50 levelling compound, DE uncoupling membrane, M24 adhesive,M32 grout and SF 300 silicone for the expansion joints. The job could only be done in the evenings and took about two months. Mapei renovation screed and Eco prime T was also used in certain areas. The stage area was completed using Amtico. There was a toilet block refit also.

See the rest of Lee's album here
 
O
Brilliant stuff Lee.
Thanks for entering mate, looks really smart.
Good luck!
 

Media information

Album
Job Of The Month 9/2016
Added by
LM
Date added
View count
1,488
Comment count
3
Rating
5.00 star(s) 1 ratings

Image metadata

Device
Apple iPhone 6
Aperture
ƒ/2.2
Focal length
4.2 mm
Exposure time
1/33 second(s)
ISO
100
Flash
Auto, did not fire
Filename
IMG_3753.JPG
File size
1.6 MB
Date taken
Fri, 18 March 2016 3:15 PM
Dimensions
3264px x 2448px

Share this media

This website is hosted and managed by www.untoldmedia.co.uk. Creating content since 2001.



Tile Contractor Forum. The useful tile contractor website.

UK Tiling Forum Stats

Threads
67,363
Messages
881,172
Members
9,534
Latest member
Midland Commercial
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks