Hello all,
We had a wet self levelling screed floor pumped into our kitchen back in October. UF Heating has been running well since. Just ordered 900x600 limestone tiles and need advice on prep before laying them. We have been told various things, conflicting too. Do I need to seal/prime the floor? Do I need a decoupling membrane? Do I use a fast or slow drying adhesive? Do I use a flexi adhesive?
Thanks in advance!
We had a wet self levelling screed floor pumped into our kitchen back in October. UF Heating has been running well since. Just ordered 900x600 limestone tiles and need advice on prep before laying them. We have been told various things, conflicting too. Do I need to seal/prime the floor? Do I need a decoupling membrane? Do I use a fast or slow drying adhesive? Do I use a flexi adhesive?