Thread: Tiling in Oz
View Single Post
Old 23-06-2008   #7
MICK the Tiler
TF Moderator & Pro Tiler


 
MICK the Tiler's Avatar
 
Belter Champion! Blitz World War Champion! Yeti Sports 1- Bloody Pingu Champion!
Join Date: Mar 2008
Location: Brisbane, Australia
Posts: 1,127
Thanks: 87
Thanked 286 Times in 181 Posts
MICK the Tiler has a spectacular aura aboutMICK the Tiler has a spectacular aura about
View MICK the Tiler's Photo Album
Default Re: Tiling in Oz

Hi Mick,

If your bathrooms are just 4 nice walls with minimum cutting and no externals and vertical features or friezes and no baths or vanities windows to tile around then tiling it in a day would be possible. But as you get more fixtures and fittings along with features and the like I'd allow 2 days to tile and a half day to grout and silicone. You won't get much more work you can do on that half day grouting and the like so round it up to 3 days finished. For the room you describe I'd charge $55/m2 or more depending on the state of the walls and the materials I was expected to fix, but that would be my base price.

Checkout My Speedy Tiler Tips

"The Day you think you are the Best you can be is The Day you Stop Learning"
MICK the Tiler is online now   Reply With Quote
 
[Output: 11.05 Kb. compressed to 10.47 Kb. by saving 0.58 Kb. (5.21%)]