hi guys
im about to start my first tiling job on my own kitchen floor.
i have already lifted the old tiles and revealed a concrete floor which has a slight run on it down towards the doorway
of my conservatory.will i need to level the floor with a compound or get away with it if i start in the doorway and gradually use less adhesive at the other end?
cheers
