Thread: Bathroom Coomb
View Single Post
Old 06-06-2008   #1
DavieA
TilersForums Contributor
Points: 1,182, Level: 18 Points: 1,182, Level: 18 Points: 1,182, Level: 18
Activity: 0% Activity: 0% Activity: 0%
 

Join Date: Apr 2008
Location: Scotland
Posts: 80
Thanks: 2
Thanked 0 Times in 0 Posts
DavieA is on a distinguished road
View DavieA's Photo Album
Default Bathroom Coomb

Well started tiling a bathroom today ,customer wanted tiling down from a comb ceiling which was fine but it became one of those nightmare jobs when i put my level to the comb and it was like a rollercoaster up and down and way off level so instead of placing the trim in the comb and following the wavy ceiling i placed it just under but level as i thought if i was to follow the comb by the time i hit the vanity unit(which is level) it would be really obvious that the tiles sitting just above it were unlevel and didnt think it would look good but now obviously the trim is 1mm under the comb on the right as u look at the wall and about 5mm on the left.

Took ages to sort it out and set out the room and feel like ive acheived nothing today!!

Did i do the right thing?? Pics Attached

Attached Images
File Type: jpg 06062008195.jpg (345.4 KB, 81 views)
File Type: jpg 06062008192.jpg (287.4 KB, 65 views)

Last edited by DavieA; 06-06-2008 at 05:51 PM.
DavieA is offline   Reply With Quote
 
[Output: 12.31 Kb. compressed to 11.56 Kb. by saving 0.75 Kb. (6.12%)]