View Single Post
Old 17-05-2008   #5
Fekin
Tilersforums Black Prince


 
Fekin's Avatar
Default Re: help with quote .

Floor will\should only take half a day to 3/4 of a day really.

Floor tiles to be scrubbed down with sugar soap and maybe roughed up a little with half a brick or something for that extra key grip if they are smooth glazed tiles, and floor should be already nice and level anyway to tile straight onto, and using a rapid set flexi adhesive you could grout the same day.

Wall prep say half a day if it's in a bit of a state and a day to tile and maybe grout the next morning, so overall 3 days at whatever day rate you need to earn really.
Fekin is offline   Reply With Quote
 
[Output: 13.67 Kb. compressed to 13.12 Kb. by saving 0.55 Kb. (4.03%)]