Results 1 to 6 of 6
  1. #1
    Tilers Forums Arms Member
    Join Date
    Jan 2008
    Posts
    73
    Post Thanks / Like
    Mentioned
    0 Post(s)

    Default first bathroom finished in 5 days!

    hi all just finished my first bathroom 21 m2.
    Is 5 days to long for doing this?

    how long could u do it?
    Also struggled a wee bit around the window recess.got
    I was not sure when the best time to put the beads on.
    any tips would be great

  2. #2
    Raja
    Guest

    Default Re: first bathroom finished in 5 days!

    Hello Andy speed comes with experiance as long as it looks nice and u r happy with it then 5 days does not matter.

    As for tiling around a window recess i have seen a post some where from Gaz@BAL try looking for it in the search mode as it is very informative and shows how to correctrly tile and mitre around a window recess

    All the best Mate weldone

  3. #3
    TilersForums Black Prince Fekin's Avatar
    Join Date
    Jun 2007
    Location
    Leyland
    Posts
    5,339
    Post Thanks / Like
    Mentioned
    0 Post(s)

    Default Re: first bathroom finished in 5 days!

    Speed comes with time, but once you have a few under your belt your going to be wanting to do it in 3 days.

    Good job, and post any pics if you have them.

  4. #4
    Tilers Forums Arms Member
    Join Date
    May 2007
    Location
    Birmingham
    Posts
    253
    Post Thanks / Like
    Mentioned
    0 Post(s)

    Default Re: first bathroom finished in 5 days!

    agree with fekin. three days when your up to speed.

  5. #5
    Member
    Join Date
    Sep 2007
    Posts
    1,534
    Post Thanks / Like
    Mentioned
    0 Post(s)

    Default Re: first bathroom finished in 5 days!

    Quote Originally Posted by andyb_987 View Post
    hi all just finished my first bathroom 21 m2.
    Is 5 days to long for doing this?

    how long could u do it?
    Also struggled a wee bit around the window recess.got
    I was not sure when the best time to put the beads on.
    any tips would be great
    I've just got my first job and start it next thursday,,,I'ts the same size bathroom plus a small floor and i've allowed myself a week to do it...Is this enough?Monty

  6. #6
    Tool Hound Sir Ramic's Avatar
    Join Date
    Jan 2008
    Location
    Stourbridge, West Midlands
    Posts
    23,025
    Post Thanks / Like
    Mentioned
    7 Post(s)

    Default Re: first bathroom finished in 5 days!

    All depends on what tile you are using surely. As long as the job is good at the end and you are happy with the price you get paid then all is good.

Similar Threads

  1. NP Tiling - finished bathroom (almost!)
    By pilsburypie in forum I Recommend My Tiler
    Replies: 5
    Last Post: 11-06-2011, 10:55 PM
  2. Bathroom is finished at last ... photos here
    By bunnycd in forum Tiling Forum
    Replies: 10
    Last Post: 10-06-2011, 02:51 PM
  3. Replies: 8
    Last Post: 08-05-2010, 06:54 PM
  4. Pics of my finished DIY bathroom
    By GaryM in forum Tile Adhesive Grout
    Replies: 33
    Last Post: 08-03-2010, 03:59 PM
  5. Pictures: Bathroom nearly finished
    By macten in forum Tiling Forum
    Replies: 24
    Last Post: 29-10-2009, 08:15 PM
  6. I've finally finished my bathroom!
    By newbie2 in forum Tiling Forum
    Replies: 17
    Last Post: 24-11-2008, 09:34 PM
  7. I've finally finished my bathroom!
    By newbie2 in forum DIY Tiling
    Replies: 17
    Last Post: 24-11-2008, 09:34 PM
  8. Sealant for Finished Bathroom
    By Quarkrad in forum Tiling Forum
    Replies: 3
    Last Post: 29-05-2008, 03:25 PM
  9. Replies: 6
    Last Post: 23-12-2007, 07:22 PM

Visitors found this page by searching for:

Nobody landed on this page from a search engine, yet!


If you like our tiling forum, then perhaps checkout our Electrical Forum or even our professional Plumbing Forum.
Tens of thousands of tradesmen and over 2 million combined posts.


[Output: 82.32 Kb. compressed to 74.13 Kb. by saving 8.18 Kb. (9.94%)]