Quote:
Originally Posted by Fred All this, I can tile 20m2 in a day! It's all rubbish. It's better to put up 8m2 properly, then to mess up 20m2 in a day. A bathroom 20m2 plus 4 m2 on the floor takes me 3 days. If you have a labourer, thats a different subject, but on your own in 2 days, total rubbish. |
I agree, have to say it would probably take me a bit longer than that, Fred. Took me 5 days for 13m2 walls and 6.5 m2 floor, excluding prep, UFH and leveller.
Grumpy