View Single Post
Old 28-10-2007   #9
grumpygrouter
* TF Super Moderator *


 
grumpygrouter's Avatar
 

Join Date: Apr 2007
Location: Nairn
Posts: 5,675
Thanks: 452
Thanked 577 Times in 456 Posts
grumpygrouter is a jewel in the roughgrumpygrouter is a jewel in the roughgrumpygrouter is a jewel in the rough
View grumpygrouter's Photo Album
Default Re: Strategic Question

Quote:
Originally Posted by Fred View Post
All this, I can tile 20m2 in a day! It's all rubbish. It's better to put up 8m2 properly, then to mess up 20m2 in a day. A bathroom 20m2 plus 4 m2 on the floor takes me 3 days. If you have a labourer, thats a different subject, but on your own in 2 days, total rubbish.
I agree, have to say it would probably take me a bit longer than that, Fred. Took me 5 days for 13m2 walls and 6.5 m2 floor, excluding prep, UFH and leveller.

Grumpy

Grumpy


Balancing Act Accounting
Turnover is Vanity, Profit is Sanity, Cash is reality!
grumpygrouter is online now   Reply With Quote
 
[Output: 10.97 Kb. compressed to 10.35 Kb. by saving 0.62 Kb. (5.63%)]