Deff dodgy cutting down. The joiners on the job were a bit dodgy.
This job was a new build. Six bathrooms & 170 sq m of downstairs floor to tile - every god damn room. Stupidly I left all the downstairs grouting till the end - took me a bloody week - managed to borrow a big washboy with a sponge on a handle - made life a lot easier.