View Single Post
Old 27-02-2007   #1
Bhoystris
New TilersForums Contributor
Points: 1,303, Level: 20 Points: 1,303, Level: 20 Points: 1,303, Level: 20
Activity: 0% Activity: 0% Activity: 0%
 

Join Date: Feb 2007
Posts: 14
Thanks: 0
Thanked 0 Times in 0 Posts
Bhoystris is on a distinguished road
View Bhoystris's Photo Album
Default Pricing Job for Mosaic Tiling

Can anyone tell me the going rate for tiling Mosaic Tiles? Seems to me there is alot more work involved, especially if its a full bathroom floor to ceiling job with alot of cutting around window, furniture bath etc. Im currently doing a job with tumbled marble mosaic tiles 2"sq and it is taking me alot more time than expected due to the number of tiles to be cut. Has anyone had a similar experience?

Bhoystris is offline   Reply With Quote
 
[Output: 10.58 Kb. compressed to 9.96 Kb. by saving 0.62 Kb. (5.83%)]