View Single Post
Old 12-10-2007   #3
quick draw macgraw
Tilers Forums Arms Member
Points: 2,243, Level: 28 Points: 2,243, Level: 28 Points: 2,243, Level: 28
Activity: 0% Activity: 0% Activity: 0%
 
quick draw macgraw's Avatar
 

Join Date: Jan 2007
Posts: 188
Thanks: 0
Thanked 0 Times in 0 Posts
quick draw macgraw is on a distinguished road
View quick draw macgraw's Photo Album
Default Re: My first shower cubicle

Hi Roamer,

My first job was through a company that rents houses and we (me and work mate who both done tiling course ) thought we were turning up to do bath splashback but when we arrived it was already tiled (splashback) but he had shower fitted and needed same tiles putting up above and around shower and towards window etc.
Probably would have took professional tiler 90 minutes but took us around five hours cos we had to cut into existing trim then get corner pieces to match then wall was out and take tiles back off to cut etc etc but in the end the job was right and learned a lot. Never do a rush or crap job cos that way you'll learn sod all just do best you can.

Cheers Steve.
quick draw macgraw is offline   Reply With Quote
 
[Output: 10.89 Kb. compressed to 10.27 Kb. by saving 0.63 Kb. (5.77%)]