View Single Post
Old 05-09-2007   #3
ChaseTiling
Tilers Forums Resident Tiling NVQ Advisors



 
ChaseTiling's Avatar
 

Join Date: Nov 2006
Posts: 413
Thanks: 5
Thanked 12 Times in 9 Posts
ChaseTiling is on a distinguished road
View ChaseTiling's Photo Album
Default Re: time scale roughly for bathroom

Quote:
Originally Posted by rossy View Post
hi all, how long roughly does it take to do 15 sq meters of bathroom lots of cuts customer wants time scale doing one at moment a bit smaller my first bathroom job and this is taking a lot longer than i thought also 300x200mm tiles any tips for underside of the top of windows will adhesive hold them easy enough using bal grip.. thanks any advise would be great... cheers rossy..
Dont forget, only spread adhesive what you can cover in tiles in 30 minutes. For the underside of reveal, reduce that time, particularly if you have the window open as the adhesive will dry a lot quicker, thus losing the adhesion against the tile.

Good luck.

Chase Tiling Academy

Tiling NVQ and Tiling Courses
TF Resident NVQ Advisor: Any questions or advice you need on getting an NVQ, then please ask me. Either PM me or post your questions in the NVQ part of the forum, where I shall be sat.

ChaseTiling is offline   Reply With Quote
 
[Output: 11.20 Kb. compressed to 10.58 Kb. by saving 0.62 Kb. (5.55%)]