Default How level should SLC go?

I've just put down 2 bags of BAL Multibase in kitchen over screed. When i look across it i can still see slight undulations in the mix! IS this normal? I've never used it before so i dont know - but i thought it should be perfectly level. Also there is a small section at the top that i haven't managed to cover - ran out. So i need to go get another bag - will i be ok blending it in an hour after the first lot went donw?