Re: Quote confusion! | | Personally we quote things like preparation, laying UFH on a day rate and work the tiling out on a metre square rate. We then check between the two.
For example, tiling 10 square metres, if day rate was £100 and square metre rate was £25.
Square metre = £250
Say 2 days to do job =£200.
Would probably go in around the £220 area (+materials) |