View Single Post
Old 03-08-2007   #2
McP77
Guest
 
Tournaments Won: 1

Posts: n/a
View McP77's Photo Album
Default Re: Quote confusion!

Personally we quote things like preparation, laying UFH on a day rate and work the tiling out on a metre square rate. We then check between the two.

For example, tiling 10 square metres, if day rate was £100 and square metre rate was £25.

Square metre = £250
Say 2 days to do job =£200.

Would probably go in around the £220 area (+materials)
  Reply With Quote
 
[Output: 7.93 Kb. compressed to 7.44 Kb. by saving 0.49 Kb. (6.21%)]