View Single Post
Old 26-07-2007   #3
GazLC81
Tilers Forums Arms Member
Points: 2,601, Level: 31 Points: 2,601, Level: 31 Points: 2,601, Level: 31
Activity: 0% Activity: 0% Activity: 0%
 

Join Date: Mar 2007
Location: Atherton, Manchester
Posts: 413
Thanks: 3
Thanked 0 Times in 0 Posts
GazLC81 is on a distinguished road
View GazLC81's Photo Album
Default Re: Quoting for plying out

I've only done about 3 floors so far so i'm not really upto speed.

I was thinking more around £220 all in. Does this seem about right?

Do you have a standard rate for plying out or do you just charge at a daily rate?

Gaz
GazLC81 is offline   Reply With Quote
 
[Output: 10.11 Kb. compressed to 9.50 Kb. by saving 0.61 Kb. (6.03%)]