Thread: Order of work
View Single Post
Old 05-08-2008   #8
Spirit
Tilers Forums Arms Member
Points: 1,294, Level: 19 Points: 1,294, Level: 19 Points: 1,294, Level: 19
Activity: 6% Activity: 6% Activity: 6%
 

Join Date: Feb 2008
Location: Guernsey
Posts: 129
Thanks: 6
Thanked 10 Times in 9 Posts
Spirit is on a distinguished road
View Spirit's Photo Album
Default Re: Order of work

The trouble with tiling up to an appliance is that the fitter will curse you, particularly if it goes wrong in the future. When the appliance is pushed back into the hole, it will drop down behind the tiles, making it difficult to get to the adjusters on the legs. If the appliance needs to be removed for maintenance, the legs have to be lowered again and then it has to be lifted over the lip of the tiles. The clever installers, after having a little swear, stick a piece of 1/2" ply on the floor to bring it level to the tiles.
Spirit is offline   Reply With Quote
The Following User Says Thank You to Spirit For This Useful Post:
FreeD (05-08-2008)
 
[Output: 10.89 Kb. compressed to 10.24 Kb. by saving 0.65 Kb. (5.99%)]