Thread: Order of work
View Single Post
Old 05-08-2008   #3
Rav daniels
New TilersForums Contributor
Points: 106, Level: 2 Points: 106, Level: 2 Points: 106, Level: 2
Activity: 0% Activity: 0% Activity: 0%
 

Join Date: Aug 2008
Location: Wigan
Posts: 13
Thanks: 1
Thanked 1 Time in 1 Post
Rav daniels is on a distinguished road
View Rav daniels's Photo Album
Default Re: Order of work

Hi mate, same as woodie on the bathroom
with kitchen i prefer it when everthing is installed, leaving kickboards off at the bottom(if any) and then tiling alittle under, then adjusting the kickboards and dropping them back on to tiles, makes the job alot neater, and saves time with the unneeded tiling, also you can tile straight off the work tops( as long as they are nice and plumb, and you get decent cuts at the top) hope this helps, all the best
Rav daniels is offline   Reply With Quote
 
[Output: 10.32 Kb. compressed to 9.72 Kb. by saving 0.60 Kb. (5.80%)]