Thread
:
packing out steps
View Single Post
03-08-2008
#
8
Spirit
Tilers Forums Arms Member
Join Date: Feb 2008
Location: Guernsey
Posts: 129
Thanks: 6
Thanked 10 Times in 9 Posts
Re: packing out steps
permalink
With that size, the only sensible way is to shutter up and cast with 6:1 concrete made with a 10mm aggregate. Roughen and wash down the surface 1st, then apply a PVA bonding coat. Concrete while the PVA ins tacky.
Spirit
View Public Profile
Send a private message to Spirit
Find More Posts by Spirit
[Output: 10.08 Kb. compressed to
9.47
Kb. by saving
0.61
Kb. (6.04%)]