View Single Post
Old 03-08-2008   #6
David - Tradetiler
New Tiling Forums Contributor


Points: 3,147, Level: 34 Points: 3,147, Level: 34 Points: 3,147, Level: 34
Activity: 2% Activity: 2% Activity: 2%
 
David - Tradetiler's Avatar
 
Yeti Sports 1- Long Shot Version Champion!
Join Date: Apr 2006
Location: Midlands
Posts: 202
Thanks: 8
Thanked 106 Times in 48 Posts
David - Tradetiler is on a distinguished road
View David - Tradetiler's Photo Album
Default Re: packing out steps

I did it once by drilling and half screwing a fair few decent screws in the face as anchors. Then I made some shuttering to the exact place and back angle and filled with mix of 6mm granite chippings (granno) and neat cement for max strength (high stress point on the nose of a step) you don’t want it breaking off an someone falling down a flight of stairs …..

“Hello is that injurylawyers4U ? I have fallen down some stairs that broke away beneath me!!.........”

David - Tradetiler.com - TilersForums.co.uk Official Tiling Tool Sponsor.


Last edited by David - Tradetiler; 03-08-2008 at 08:48 PM.
David - Tradetiler is offline   Reply With Quote
 
[Output: 12.11 Kb. compressed to 11.40 Kb. by saving 0.71 Kb. (5.85%)]