View Single Post
Old 03-08-2008   #6
asiltam
New TilersForums Contributor
Points: 372, Level: 7 Points: 372, Level: 7 Points: 372, Level: 7
Activity: 0% Activity: 0% Activity: 0%
 

Join Date: May 2008
Posts: 10
Thanks: 0
Thanked 0 Times in 0 Posts
asiltam is on a distinguished road
View asiltam's Photo Album
Default Re: Not sure about charging!!

Quote:
Originally Posted by CLAYS TILES View Post
all areas have different prices!
are you including materials in with quotes?
if you have say a small kitchen splashbacks (say 3m2) a m2 charge would be pointless as you can charge a day rate,as your still new to the trade you might be a little slower to start off,so if you look at the job & charge it by a day rate of £150 & you take 3 days to do it,don't be upset or put off as speed will come quite quickly!
just remember one thing if a job is worth doing, its worth doing right! 1st time,EVERYTIME! good luck m8
Thanks for your response.

I usually quote the materials as a separate cost to be paid for before the job starts and I charge it at cost. Do you think that could put people off?
asiltam is offline   Reply With Quote
 
[Output: 11.16 Kb. compressed to 10.51 Kb. by saving 0.65 Kb. (5.84%)]