Quote:
Originally Posted by alib103 Just had my first call to go and give a quote. The guy has all the materials already as the previosu tiler has let him down. Needs old tiles stripped off first then its a kitchen splash back, 4m2 in total. Needs it done before Sat so i said i could do it on an evening or two. I was thinking £150 (days rate) is that about right? Not really sure how quick i will get old tiles off. |
When you strip off old tiles, you will almost certainly pull half the wall off too. you might have to rip the lot out and replace the plasterboard. you won't know until you start though.